Bradford White Corp.
Section 9 – Setup and Configuration
............................... 44
9.1
Review of Lead/Lag Control System ............. 44
9.1.1
About Lead/Lag Operation ............................. 44
9.1.2
Lead/Lag Modulation Cycle ........................... 45
9.1.3
NTH Lead/Lag with Indirect
Domestic Hot Water ....................................... 46
9.2
Connection Terminals ..................................... 46
9.3
Brute Elite System Configurations
................. 48
9.4
Installation Jobs .............................................. 55
A
Note for Systems Using Common
Venting ........................................................... 55
B
Naming the Controllers .................................. 55
C
Make One Control the Lead/Lag
Master ............................................................. 56
D
Disable the Lead/Lag Master Function
on the Lead/Lag Slaves .................................. 57
E
Set up the Modbus Control Addressing .......... 58
F
Set the Flap Valve IDs .................................... 59
G
Disconnect Unused Operator
Interfaces ........................................................ 63
H
Connect the Modbus Wiring........................... 63
I
Set the Parameters Used by the
Lead/Lag System ............................................ 64
About the “Time of Day” Function ................ 68
J
Install the System Sensor and Adjust
the Setpoint ..................................................... 68
K
Set the Lead/Lag Outdoor Reset and
Warm Weather Shutdown ............................... 68
About “Outdoor Reset” .................................. 69
L
Building Automation or Multiple Boiler
Control Thermostat Demand ......................... 70
M
Building Automation or Multiple Boiler
4-20mA Setpoint Control .............................. 70
N
Building Automation or Multiple Boiler
4-20mA Modulation Control .......................... 71
O
Combustion Setup Procedure ......................... 71
P
Setting the Date and Time on the
System Display ............................................... 76
9.5
Setup for Domestic Hot Water on a
Lead/Lag System ............................................ 77
Setup Type 1 ................................................... 77
Setup Type 2 ................................................... 78
Setup Type 3 ................................................... 79
9.6
Gateway Connections to a
Building Automation System ......................... 80
9.7
Setup for High Altitude Operation -
NT 1700 Only ................................................. 80
9.8
Installer Parameters ........................................ 81
Section 10 - Operating Instructions ................................. 88
10.1
Filling the Boiler System ................................ 88
10.2
Initial Operation ............................................. 89
10.2.1 Initial Burner Operation ................................. 89
10.2.2 Combustion Setup Procedure ......................... 89
10.3
Shutting Down the Brute Elite ....................... 89
10.4
Restarting the Brute Elite ............................... 89
Section 11 – Maintenance ................................................ 90
11.1
System Maintenance....................................... 90
11.2
Maintenance Notes ......................................... 90
11.2.1 Burner ............................................................. 90
11.2.2 Modulating Gas Valve/ Venturi ...................... 90
11.2.3 Controllers ...................................................... 91
11.2.4 Ignitor Assembly ............................................ 91
11.2.5 Flame Sensor .................................................. 91
11.2.6 Transformer with Integral
Circuit Breaker ............................................... 91
11.2.7 Blower ............................................................ 92
11.2.8 Heat Exchanger Coils ..................................... 92
11.2.9 Gas Pressure Switches (optional) ................... 92
11.2.10 Natural/Propane Gas Conversion ................. 93
Section 12 – Troubleshooting .......................................... 94
12.1
Potential Setup and Synchronization
Problems ......................................................... 94
12.1.1 Controller Synchronization ............................ 94
12.1.2 Flap Valve Status Checks ............................... 95
12.2
About Lockouts, Holds, and Alerts ................ 95
12.2.1 Responding to a Lockout, Hold,
or Alert ............................................................ 95
12.2.2 Viewing the Lockout and Alert
Histories ......................................................... 96
12.3
Troubleshooting Table .................................... 98
12.4
Diagnostic Tests and Input/Output
Indicators ...................................................... 113
12.5
Lead/Lag Slave Diagnostics ......................... 114
12.6 Statistics ....................................................... 114
12.7 Analysis ........................................................ 114
12.8
Control Snapshot .......................................... 115
12.9
Operating Sequence ...................................... 115
Section 13 – Replacement Parts ..................................... 118
13.1
General Information ..................................... 118
13.2
Parts List ....................................................... 118
13.3
Parts Illustrations .......................................... 124
ii
Summary of Contents for BNTH1000
Page 2: ...Bradford White Corp...
Page 12: ...Page 8 Bradford White Corp Fig 6 Dimensions BNT 1700...
Page 38: ...Page 34 Bradford White Corp Fig 21 Ladder Diagram...
Page 39: ...Page 35 Brute Elite Boilers and Water Heaters Fig 22 Wiring Diagram...
Page 40: ...Page 36 Bradford White Corp...
Page 52: ...Page 48 Bradford White Corp Fig 51 Connection Terminals...
Page 130: ...Page 126 Bradford White Corp Fig 141 Rear Panel BNT1000 Fig 142 Rear Panel BNT1700...
Page 131: ...Page 127 Brute Elite Boilers and Water Heaters Fig 143 Machine Frame BNT1700...
Page 132: ...Page 128 Bradford White Corp Fig 144 Front Panels and Covers BNT1000 and BNT1700...
Page 133: ...Page 129 Brute Elite Boilers and Water Heaters Fig 145 Burners and Combustion Chamber BNT1000...
Page 134: ...Page 130 Bradford White Corp Fig 146 Burners and Combustion Chamber BNT1700...
Page 136: ...Page 132 Bradford White Corp Fig 149 Burner Detail BNT1700...
Page 139: ...Page 135 Brute Elite Boilers and Water Heaters This page intentionally left blank...
Page 140: ...Page 136 Bradford White Corp This page intentionally left blank...