Page 77
Brute Elite Boilers and Water Heaters
• Turn off the call for heat, and set both
burners to run at 1200 RPM for low fire. Turn
on the call for heat, and check the performance
again.
20. If the CO
2
doesn’t track between the correct
limits, there is a possibility that one of the
burners has not been set up correctly. If
this occurs, repeat the setup procedure to
confirm that each burner is set up correctly.
If this condition persists, call the factory for
assistance. Before calling, be prepared to
supply the factory with the conditions at the
site where the boiler is installed - for example,
vent lengths, gas supply pressures with all
boilers operating, CO
2
and CO for each burner
individually and together, etc. Be able to
describe the ignition characteristics and the
color of the flame seen through the sight glass
of each burner.
21. When troubleshooting a burner setup, it is
sometimes helpful to watch the pressure
differential between the gas inlet and outlet.
To measure this, install a differential pressure
gauge capable of reading negative 0.01 inches
W.C. (0.002kPa). Attach the gauge to the
positive and negative ports shown in Fig. 104.
When the testing is complete, remove the
pressure gauge, and plug the ports. Repeat the
test setup on each burner.
Job P - Setting the Date and time on the
System Display
(This is a Lead/Lag function – do this once for the whole Lead/
Lag system. Use the controller set up as the Lead/Lag Master –
usually the Primary controller on Boiler 1.)
The display acting as the Lead/Lag Master includes
an internal clock, which keeps track of the date and
time. This setting is important, because all of the
log entries for any Lockouts and Alerts include time
listings. If the Date and Time setting for the Lead/
Lag Master is not correct, the listings in the Lockout
and Alert logs will be incorrect.
The current version of the display does not include a
battery backup. This means that, if the boiler which
includes the display loses power, the Date and Time
setting for the system will be lost. (Any Faults or
Alerts recorded before the boiler lost power will
have the correct date and time listed.)
For this reason, it is important that you set the Date
and Time in two situations:
• When you first set up the Lead/Lag system.
• After each occasion when the power to the
boiler is interrupted.
Here is the procedure:
1. Start at the Home screen.
fig. 107 – Home Screen
2. Press the Setup button. The system will
present the Setup screen.
fig. 108 – Setup Screen
3. Press the Display Setup button. The Display
Setup screen is shown in Fig. 106.
fig. 109 – Display Setup Screen
Summary of Contents for BNTH1000
Page 2: ...Bradford White Corp...
Page 12: ...Page 8 Bradford White Corp Fig 6 Dimensions BNT 1700...
Page 38: ...Page 34 Bradford White Corp Fig 21 Ladder Diagram...
Page 39: ...Page 35 Brute Elite Boilers and Water Heaters Fig 22 Wiring Diagram...
Page 40: ...Page 36 Bradford White Corp...
Page 52: ...Page 48 Bradford White Corp Fig 51 Connection Terminals...
Page 130: ...Page 126 Bradford White Corp Fig 141 Rear Panel BNT1000 Fig 142 Rear Panel BNT1700...
Page 131: ...Page 127 Brute Elite Boilers and Water Heaters Fig 143 Machine Frame BNT1700...
Page 132: ...Page 128 Bradford White Corp Fig 144 Front Panels and Covers BNT1000 and BNT1700...
Page 133: ...Page 129 Brute Elite Boilers and Water Heaters Fig 145 Burners and Combustion Chamber BNT1000...
Page 134: ...Page 130 Bradford White Corp Fig 146 Burners and Combustion Chamber BNT1700...
Page 136: ...Page 132 Bradford White Corp Fig 149 Burner Detail BNT1700...
Page 139: ...Page 135 Brute Elite Boilers and Water Heaters This page intentionally left blank...
Page 140: ...Page 136 Bradford White Corp This page intentionally left blank...