Page 15
Brute Elite Boilers and Water Heaters
determine that a vent terminal must be
higher than the minimum shown in codes,
depending upon local conditions.
6. Locate the terminal so the vent exhaust does
not settle on building surfaces or other nearby
objects. Vent products may damage surfaces or
objects.
7. If the boiler or water heater uses ducted
combustion air from an intake terminal located
on the same wall, see Figures 10 and 11 for
proper spacing and orientation.
If the vent termination is located in an area exposed
to high winds, an optional PVC tee (the same
diameter as the vent pipe) may be used. The tee’d
vent termination offers greater protection from wind
related operating issues.
3.3.2 Side Wall Combustion air terminal
The Bradford White side wall combustion air
terminal must be used when the heater takes air
from a side wall. (See Table 3.) Contact Bradford
White for AL29-4C termination fittings. Consider the
following when installing the terminal. (See Figures
10 and 11).
1. Do not locate the air inlet terminal near a
source of corrosive chemical fumes (e.g.,
cleaning fluid, chlorine compounds, etc.).
2. Locate the terminal so that it will not be subject
to damage by accident or vandalism. It must be
at least 7 feet ( 2.1 m) above a public walkway.
3. Locate the combustion air terminal so that it
cannot be blocked by snow. The National Fuel
Gas Code requires that it be at least 12 inches
(30 cm) above grade, but the installer may
determine it should be higher, depending upon
local conditions.
4. If the Brute Elite is side-wall vented to the
same wall, locate the vent terminal at least 1
foot (0.3 m) above the combustion air terminal.
5. Multiple vent kits should be installed such that
the horizontal distance between outlet group
and inlet group is 36” (90 cm). (See Figure
10.)
6. The vent outlet must be at least 12” above the
top of the air inlet, and must be at least 36” (90
cm) horizontally from the air inlet. (See Figure
10.)
3.3.3 Vertical Vent terminal
fig. 11 - minimum Venting Distance
IMPORTANT: All terminals must be placed so that they remain at least
12” above the expected snow line. Local codes may have more specific
requirements, and must be consulted. Refer to the NFPA54 National Fuel
Gas Code and your local codes for all required clearances for venting.
fig. 10 - multiple Side-Wall terminals, air and
Vent
Summary of Contents for BNTH1000
Page 2: ...Bradford White Corp...
Page 12: ...Page 8 Bradford White Corp Fig 6 Dimensions BNT 1700...
Page 38: ...Page 34 Bradford White Corp Fig 21 Ladder Diagram...
Page 39: ...Page 35 Brute Elite Boilers and Water Heaters Fig 22 Wiring Diagram...
Page 40: ...Page 36 Bradford White Corp...
Page 52: ...Page 48 Bradford White Corp Fig 51 Connection Terminals...
Page 130: ...Page 126 Bradford White Corp Fig 141 Rear Panel BNT1000 Fig 142 Rear Panel BNT1700...
Page 131: ...Page 127 Brute Elite Boilers and Water Heaters Fig 143 Machine Frame BNT1700...
Page 132: ...Page 128 Bradford White Corp Fig 144 Front Panels and Covers BNT1000 and BNT1700...
Page 133: ...Page 129 Brute Elite Boilers and Water Heaters Fig 145 Burners and Combustion Chamber BNT1000...
Page 134: ...Page 130 Bradford White Corp Fig 146 Burners and Combustion Chamber BNT1700...
Page 136: ...Page 132 Bradford White Corp Fig 149 Burner Detail BNT1700...
Page 139: ...Page 135 Brute Elite Boilers and Water Heaters This page intentionally left blank...
Page 140: ...Page 136 Bradford White Corp This page intentionally left blank...