System 20 –
Multiple boiler, System control, Common vent, 4-20 mA setpoint control, Outdoor reset
Job A
Note on common venting
Job B
Set up the names for each of the controllers
Job C
Make one control the Lead/Lag master
Job D
On each of the controllers that will act as a slave, disable the Lead/Lag Master
Job E
Set up the Modbus control addressing to assign addresses for each of the controls
Job F
Set up the addresses for the flap valves
Job G
Disconnect the Operator Interfaces that will not be used
Job H
Connect the Modbus wiring
Job I
Set the parameters used by the Lead/Lag system
Job M
Building automation or multiple boiler control 4-20 mA setpoint control
Job K
Lead/Lag outdoor reset and warm weather shutdown
Job O
Set up the combustion on each of the burners
Job P
Set the date and time on the system
System 21 –
Multiple boiler, System control, Common vent, 4-20 mA modulation control
Job A
Note on common venting
Job B
Set up the names for each of the controllers
Job C
Make one control the Lead/Lag master
Job D
On each of the controllers that will act as a slave, disable the Lead/Lag Master
Job E
Set up the Modbus control addressing to assign addresses for each of the controls
Job F
Set up the addresses for the flap valves
Job G
Disconnect the Operator Interfaces that will not be used
Job H
Connect the Modbus wiring
Job I
Set the parameters used by the Lead/Lag system
Job N
Building automation or multiple boiler control 4-20 mA modulation control
Job O
Set up the combustion on each of the burners
Job P
Set the date and time on the system
System 22 –
Multiple boiler, System control, Common vent, 4-20 mA modulation control, Outdoor reset
Job A
Note on common venting
Job B
Set up the names for each of the controllers
Job C
Make one control the Lead/Lag master
Job D
On each of the controllers that will act as a slave, disable the Lead/Lag Master
Job E
Set up the Modbus control addressing to assign addresses for each of the controls
Job F
Set up the addresses for the flap valves
Job G
Disconnect the Operator Interfaces that will not be used
Job H
Connect the Modbus wiring
Job I
Set the parameters used by the Lead/Lag system
Job N
Building automation or multiple boiler control 4-20 mA modulation control
Job K
Lead/Lag outdoor reset and warm weather shutdown
Job O
Set up the combustion on each of the burners
Job P
Set the date and time on the system
Summary of Contents for BNTH1000
Page 2: ...Bradford White Corp...
Page 12: ...Page 8 Bradford White Corp Fig 6 Dimensions BNT 1700...
Page 38: ...Page 34 Bradford White Corp Fig 21 Ladder Diagram...
Page 39: ...Page 35 Brute Elite Boilers and Water Heaters Fig 22 Wiring Diagram...
Page 40: ...Page 36 Bradford White Corp...
Page 52: ...Page 48 Bradford White Corp Fig 51 Connection Terminals...
Page 130: ...Page 126 Bradford White Corp Fig 141 Rear Panel BNT1000 Fig 142 Rear Panel BNT1700...
Page 131: ...Page 127 Brute Elite Boilers and Water Heaters Fig 143 Machine Frame BNT1700...
Page 132: ...Page 128 Bradford White Corp Fig 144 Front Panels and Covers BNT1000 and BNT1700...
Page 133: ...Page 129 Brute Elite Boilers and Water Heaters Fig 145 Burners and Combustion Chamber BNT1000...
Page 134: ...Page 130 Bradford White Corp Fig 146 Burners and Combustion Chamber BNT1700...
Page 136: ...Page 132 Bradford White Corp Fig 149 Burner Detail BNT1700...
Page 139: ...Page 135 Brute Elite Boilers and Water Heaters This page intentionally left blank...
Page 140: ...Page 136 Bradford White Corp This page intentionally left blank...