© 2004,1996 BRUNO INDEPENDENT LIVING AIDS, INC.®
25
SRE-1540 UL 06-18-2004
[ ] With the seat in the central riding position, move the Elevator completely down and up
the rail, while observing the elevator-to-wall clearance. A clearance of 1/2" to 1" is
acceptable. Repeat the run with the seat in the folded position. If necessary, adjust
the rail placement by sliding it closer to, or further from the wall.
ELECTRA-RIDE TRIAL
RUN
REMINDER:
MAKE SURE
SUFFICIENTCLEARANCE
EXISTS FOR CALL/SEND
ANTENNA OVER ENTIRE
TRAVEL OF RAIL.
SAFETY
SWITCH PANEL
[ ] Verify proper operation of the following: speed, direction, final limit switch, footrest
safety switch, seat swivel safety switch, and remote call/send transmitter.
INSTALLATION
The carriage comes equipped with a safety switch panel. As the carriage approaches
the end of the rail, the panel is depressed, which activates the switch, and stops the
carriage.
INSTALLATION