88
Z31823_00_05
Configuration (administrator)
1. Select your magnet from the pull-down list.
2. Enter the temperature measuring resistance for T1 and T2. The limit data is then
calculated automatically.
3. Press the
Next
button to continue to the next magnet setup step.
Figure 12.2 Magnet Setup Step 2
4. Enter the setpoint for pressure value P2. The correct setting depends on the height
above sea level where the magnet is installed.
Alternatively, to calculate the P2 heater setpoint, enter the height value in the field
provided press the
Calculate
Setpoint
button.
The setpoint is the pressure that is to be reached with the help of the heating regu-
lator.
The P2 APD value will be calculated automatically.
5. Enter the resistance values for the two heating resistors. These are usually 100
Ohms. More detailed information can be found in the magnet manual.
6. Press the
Next/Write Values
button to assume the configuration data.
7. When prompted, confirm that the configuration is correct by pressing
Yes
, or
No
if
you need to revise the data.
Setpoint for P2
Resistance Value
for Heater 1 and
for Heater 2
Summary of Contents for BMPC/2
Page 8: ...8 Z31823_00_05 Table of Contents...
Page 14: ...14 Z31823_00_05 Safety...
Page 20: ...20 Z31823_00_05 Principles of Operation...
Page 42: ...42 Z31823_00_05 Alarm System...
Page 62: ...62 Z31823_00_05 Hardware Overview...
Page 64: ...64 Z31823_00_05 Maintenance and Cleaning...
Page 86: ...86 Z31823_00_05 Troubleshooting Figure 11 10Replacing the Control Unit Fuse Fuse Insert...
Page 122: ...122 Z31823_00_05 Technical Data...
Page 124: ...124 Z31823_00_05 Contact...
Page 126: ...126 Z31823_00_05 Warning Signs...
Page 130: ...130 Z31823_00_05 Figures...
Page 132: ...132 Z31823_00_05 Tables...
Page 135: ......