
249
GEARCASE
GEARCASE REMOVAL AND INSTALLATION
12
Slide the gearcase into place, making sure that:
•
Driveshaft engages the crankshaft
•
Water tube enters grommet on water pump
•
Upper shift rod enters the shift rod connector.
Apply
Gasket Sealing Compound
to threads of the
gearcase retaining screws. Install and tighten the
screws to a torque of 128 to 146 in. lbs. (14.5 to
16.5 N·m).
For 25 inch models, apply
Triple-Guard
grease to
threads of the studs. Install washers and gearcase
retaining nuts. Tighten nuts to a torque of 128 to
146 in. lbs. (14.5 to 16.5 N·m).
Align the groove in the upper shift rod with the
screw hole in the connector. Apply
Gasket Sealing
Compound
to threads of the shift rod connector
screw. Tighten screw, with washer, to a torque of
60 to 84 in. lbs. (7 to 9.5 N·m).
Install the port and starboard water intake screens
with water intake holes positioned at the rear of
gearcase. Tighten screws to a torque of 10 to 14
in. lbs. (1.1 to 1.6 N·m).
IMPORTANT:
During break-in period of a reas-
sembled gearcase, change the gearcase lubricant
between 10 to 20 hours of operation.
1.
Gearcase retaining screws
007653
1.
Gearcase retaining nuts
008371
1
1
007654
1.
Water intake screen
007649
WARNING
To prevent loss of operator control, check
for proper shifting operation and adjust, if
necessary.
1
Summary of Contents for Evinrude E-TEC Series
Page 1: ...Main Menu...
Page 2: ......
Page 146: ...144 OILING SYSTEM OIL RECIRCULATION DIAGRAM OIL RECIRCULATION DIAGRAM 007316...
Page 194: ...192 POWERHEAD POWERHEAD VIEWS Port Rope Start Models Starboard Rope Start Models 008430 008431...
Page 195: ...193 POWERHEAD POWERHEAD VIEWS 10 Front 007809...
Page 196: ...194 POWERHEAD POWERHEAD VIEWS Rear 007810...
Page 197: ...195 POWERHEAD POWERHEAD VIEWS 10 Top 008280...
Page 292: ...S 2...
Page 322: ...I 8 INDEX...
Page 336: ......
Page 338: ......
Page 341: ......
Page 342: ......