
211
MIDSECTION
STERN BRACKET – POWER TILT MODELS
11
Make sure cable clamp is positioned as shown.
Route the hydraulic unit and trim sender har-
nesses through the grommet in the port stern
bracket.
Secure harness in wire clamp as shown.
Install bushings in hydraulic unit. Position hydrau-
lic unit between stern brackets and install the
angle adjustment rod.
Place the ground lead between the port stern
bracket and tie bar as shown. Assemble the tie
bar to the stern brackets. Apply
Ultra Lock
to the
threads of the tie bar screws. Install the screws
and tighten to a torque of 144 to 168 in. lbs. (16 to
19 N·m).
1.
Cable clamp
007696
007697
1.
Wire clamp
007698
1
1
007699
007700
007692
1
Summary of Contents for Evinrude E-TEC Series
Page 1: ...Main Menu...
Page 2: ......
Page 146: ...144 OILING SYSTEM OIL RECIRCULATION DIAGRAM OIL RECIRCULATION DIAGRAM 007316...
Page 194: ...192 POWERHEAD POWERHEAD VIEWS Port Rope Start Models Starboard Rope Start Models 008430 008431...
Page 195: ...193 POWERHEAD POWERHEAD VIEWS 10 Front 007809...
Page 196: ...194 POWERHEAD POWERHEAD VIEWS Rear 007810...
Page 197: ...195 POWERHEAD POWERHEAD VIEWS 10 Top 008280...
Page 292: ...S 2...
Page 322: ...I 8 INDEX...
Page 336: ......
Page 338: ......
Page 341: ......
Page 342: ......