6-207
Disassembly / Replacement / Adjustment
(6)
Put a mark on the tube connected to the solenoid valve to be replaced so as to put it back in place, and detach the
tube from the valve nipple. (Shown in the photo is valve A.)
(7)
Disconnect the relay connector of the target solenoid.
(8)
Remove the screw fixing the target solenoid valve to detach the solenoid valve.
Assembly of solenoid valve A, B, C, K, L, and M
(1)
To perform the assembly, take the reverse procedures to disassembly operation.
Put a mark.
Summary of Contents for GTX-4
Page 1: ...GTX 4 GARMENT PRINTER Service Manual ...
Page 175: ...5 10 Regular Maintenance X0204 Cleaning conditions Pre cleaning state Post cleaning state ...
Page 186: ...5 21 Regular Maintenance X0205 Cleaning conditions Pre cleaning state Post cleaning state ...
Page 456: ...9 1 9 Block diagram Control circuitry ...
Page 463: ...Appendix Setup Manual ...