Brocade MLX Series and Brocade NetIron XMR Hardware Installation Guide
283
53-1002373-02
Installing a Brocade NetIron XMR 32000 router
4
FIGURE 197
Routing upper-left quadrant cables up
2. Route cables from slots #3 and #4 up through comb A. Refer to
Figure 197
.
3. Route cables from slots #5 and #6 up through comb B.
4. Route cables from slots #7 and #8 up through comb C.
1
Upper left quadrant
3
Comb B (slot #5 and #6 cables)
2
Comb C (slot #7 and #8 cables)
4
Comb A (slot #3 and #4 cables)
1
2
3
4