![Böhnke + Partner bp308 Installation Manual Download Page 5](http://html1.mh-extra.com/html/bohnke-partner/bp308/bp308_installation-manual_2784778005.webp)
7.8.4
Example of a Correct Topology......................................................................................63
7.8.4.1 Control Unit of an lift Out of a Group.................................................................................63
7.8.4.2 Group of Two lifts in One Line ..........................................................................................64
7.8.4.3 Group of Two lifts in Three Lines ....................................................................................65
7.8.4.4 Group of Two lifts in Two Lines .......................................................................................66
7.8.5
Pin Assignments ........................................................................................................... 67
7.8.5.1 Pin Assignment of D-Sub Plug Connector with 9 Pins .....................................................67
7.8.5.2 Pin Assignment of the RJ45 Socket Connector ...............................................................67
7.8.5.3 Pin-Assignment of the Open-Style-Connector..................................................................68
7.8.6
Node IDs of the CAN Components ...............................................................................68
7.9
Travelling Cable to the Car Top Box........................................................................69
7.10 Selection of the Frequency Inverter........................................................................70
7.10.1 Selection by CAN Bus ...................................................................................................70
7.10.2 DCP-Connection to the Inverter ....................................................................................70
7.10.2.1 Pin Assignment of DCP Plug Connector ........................................................................70
7.10.3 Wiring in Parallel with RVM-01.......................................................................................71
7.11 Installation of the Absolute Encoder.......................................................................73
7.12 Interconnection of the Group...................................................................................73
7.13 Data Lines to the Remote Diagnostics
System................................................................................................................................ 74
7.13.1 Analogue Telephone Line..............................................................................................74
7.13.2 ISDN.............................................................................................................................. 74
7.13.3 Ethernet......................................................................................................................... 74
7.13.4 LON............................................................................................................................... 75
7.14 Installation of the Emergency Call System.............................................................75
8 Commissioning Instructions.......................................................................................77
8.1
Preparation................................................................................................................78
8.2
Voltage-Test Module STM-02...................................................................................78
8.2.1
Prior to the First Switch-on ...........................................................................................78
8.2.2
Functional Description of Voltage Test Module STM-02..............................................79
8.3
Technical Tips Concerning the Control Unit..........................................................79
8.4
Checks before Starting the Control Unit ................................................................86
8.5
Switching the Mains Voltage....................................................................................88
8.6
Checking the Parameters of Control Unit and Drive Unit......................................88
8.6.1
Checking the Bus Lines.................................................................................................89
8.6.2
Checking the Bus Termination.......................................................................................90
8.6.3
Checking the CAN Parameters .....................................................................................90
8.6.4
Checking the DCP Connection.......................................................................................90
8.7
First Travel with Emergency Controls.....................................................................91
8.8
First Travel with Inspection Controls......................................................................92
8.9
Course of a Regulated Two Speed Travel (Summary)...........................................94
8.9.1
Disconnection Points for the High Travelling Speed (V3) ..............................................95
8.10 Course of a Direct Travel with DCP (Summary) ....................................................96
8.11 Commissioning of the Floor selector System ......................................................97
8.11.1 Installation of the Deceleration Switches .....................................................................97
8.11.2 Basic Settings................................................................................................................ 98
8.11.3 Read-in Travel with Absolute Encoder...........................................................................99
Summary of Contents for bp308
Page 14: ...15...
Page 15: ...16 Installation Manual System bp308 Product Certifications...
Page 54: ...55 Fig 31 Interference suppression circuit diagrams...
Page 114: ...Appendix A Menu Navigation bp308 Version 88D2312 29 08 2013 116...
Page 115: ...117...
Page 150: ...152...
Page 154: ......