27
OP
ER
AT
ION
S
27
OP
ER
AT
ION
S
Making a Connection
2. Once you have ensured that the op-
erating area is clear, pull the "Extend”
handle to move the FloorHand out to
the pipe. Release the "Extend” handle
when the tool approaches the pipe
center.
Figure 12
Figure 13
WARNING: BeFoRe opeRAtING the uNIt, mAke suRe thAt you hAve ReAd ANd uNdeRstANd thIs eNtIRe mANuAl
ANd hAve BeeN pRopeRly tRAINed IN the opeRAtIoN oF the uNIt. Also veRIFy thAt the uNIt hAs BeeN pRopeRly
INspected, Adjusted ANd luBRIcAted BeFoRe eAch use.
WARNING: AlWAys clAmp the loWeR WReNch BeFoRe clAmpING the uppeR WReNch oR spINNeR.
WARNING: do Not clAmp the FlooRhANd oNto the pIpe BeFoRe the pIN hAs BeeN stABBed.
1. Slowly pull the "Lift” handle to raise
the FloorHand approximately 2 to 3
feet from the rig floor.
Note:
RememBeR to AlWAys keep youR FRee hANd oN
the GReeN sAFety hANdle.
WARNING:
NeveR AlloW youRselF oR someoNe else to Be
BetWeeN the FlooRhANd ANd the pIpe, oR ANy
FIXed oBject.
Summary of Contents for FloorHand 9GF-1102
Page 6: ...6 DESCRIPTION DESCRIPTION...
Page 10: ...10 DESCRIPTION Figure 2 1 352 mm 53 2 in 1 488 mm 58 6 in 1 174 mm 46 2 in 2 581 mm 101 6 in...
Page 11: ...11 DESCRIPTION...
Page 12: ...12 COMMISSIONING COMMISSIONING...
Page 17: ...17 INSTALLATION INSTALLATION...
Page 24: ...24 OPERATIONS 24 OPERATIONS OPERATIONS...
Page 49: ...49 MAINTENANCE INSPECTION MAINTENANCE INSPECTION...
Page 52: ...52 MAINTENANCE INSPECTION Figure 50...
Page 57: ...57 MAINTENANCE INSPECTION Figure 54...
Page 63: ...63 SPARE PARTS SPARE PARTS...
Page 65: ...DRAWINGS 65 DRAWINGS...
Page 66: ...DRAWINGS 66 Figure 55 CANTILEVER STYLE FLOORHAND WITH 9FM 2050 HYDRAULIC CYLINDER...
Page 71: ...DRAWINGS 71 FLOORHAND COMBINATION MANIFOLD 9FH 01539 Figure 60...
Page 72: ...DRAWINGS 72 FLOORHAND RETURN MANIFOLD 9FH 01540 Figure 61...
Page 92: ...INDEX 92 INDEX...
Page 104: ...INDEX 104 W WINCH 87 WINCH ASSY HOSE FITTING KIT 87 WINCH MOUNTING PLATE 87 X Y Z...