21
INS
TA
LL
AT
ION
Make Up Torque Adjustment
To make up a connection for the first time, it is necessary to set the
make up torque to the proper setting for the given tool joint, as per
appropriate specifications from either the well plan or from the drill
pipe manufacturer. Referring to normal make up procedures, it is
assumed that the unit is engaged with the lower wrench clamped on
the box and the pin has been spun up and shouldered. The make up
torque adjustment is as follows:
1. Locate the "Torque Adjustment" control knob on the control
panel below the torque gauge and break free the lock knob. Then
rotate the adjustment knob counter clockwise until it stops.
This decreases the available pressure in the torque circuit to a
minimum.
2. With the upper wrench unclamped, move the "torque" handle on
the main control valve to rotate the upper wrench fully to the break
out position (that is, where the torque cylinder is fully extended).
3. Push the "upper clamp" handle on the main control valve to clamp
the upper wrench on the pin end of the tool joint.
4. Pull and hold the "torque" handle on the main control valve. The
upper wrench may or may not begin to move in the direction of
make up. While holding the "torque" handle, rotate the "Torque
Adjustment" control knob on the control panel clockwise to increase the torque until the
reading on the torque gauge reaches the desired setting and stops moving. Hold for 3
seconds. Do not over torque the joint.
5. Lock in torque adjustment by gently tightening the locking knob. Do not over tighten.
Once the unit has been properly adjusted, it is usually not necessary to re-adjust under
normal conditions. At each connection, the operator should verify that the torque gauge
stops at the proper setting for the particular tool joint. If it does not, the unit must be re-
adjusted.
Figure 7
Figure 6
note:
iF, at any time, tHe torque pressure Drops
During tHe makeup proceDure, tHis means tHat
tHe cylinDer is out oF stroke. tHe upper WrencH
sHoulD be unclampeD anD anotHer bite sHoulD be
taken.
Summary of Contents for FloorHand 9GF-1102
Page 6: ...6 DESCRIPTION DESCRIPTION...
Page 10: ...10 DESCRIPTION Figure 2 1 352 mm 53 2 in 1 488 mm 58 6 in 1 174 mm 46 2 in 2 581 mm 101 6 in...
Page 11: ...11 DESCRIPTION...
Page 12: ...12 COMMISSIONING COMMISSIONING...
Page 17: ...17 INSTALLATION INSTALLATION...
Page 24: ...24 OPERATIONS 24 OPERATIONS OPERATIONS...
Page 49: ...49 MAINTENANCE INSPECTION MAINTENANCE INSPECTION...
Page 52: ...52 MAINTENANCE INSPECTION Figure 50...
Page 57: ...57 MAINTENANCE INSPECTION Figure 54...
Page 63: ...63 SPARE PARTS SPARE PARTS...
Page 65: ...DRAWINGS 65 DRAWINGS...
Page 66: ...DRAWINGS 66 Figure 55 CANTILEVER STYLE FLOORHAND WITH 9FM 2050 HYDRAULIC CYLINDER...
Page 71: ...DRAWINGS 71 FLOORHAND COMBINATION MANIFOLD 9FH 01539 Figure 60...
Page 72: ...DRAWINGS 72 FLOORHAND RETURN MANIFOLD 9FH 01540 Figure 61...
Page 92: ...INDEX 92 INDEX...
Page 104: ...INDEX 104 W WINCH 87 WINCH ASSY HOSE FITTING KIT 87 WINCH MOUNTING PLATE 87 X Y Z...