15
C
OM
M
IS
S
ION
ING
16.
___ Set Pressure Release Valve (PRV) output to obtain 600 psi at lower clamp
cylinder. Verify during commissioning.
17.
___ Clamp upper wrench, ensure that system pressure is now present on lower
clamp cylinders also (PRV reading should not change), unclamp upper wrench, unclamp
lower wrench.
18.
___ Mock up test pipe, with torque, at end of stroke, check that gauge dump valve
functions correctly.
19.
___ Stall spinner in make direction and hold for 5 seconds, check for leaks.
20.
___ Stall spinner in break direction and hold for 5 seconds, check for leaks.
21.
___ Operate manipulator / lift cylinder full up & down 10 times to remove all air from
cylinder and counterbalance valve, check for leaks. If commissioning, inform rig crew
that this should be done after every rig-up.
22. ___ Raise manipulator / lift cylinder to mid stroke, check that counterbalance valve
holds.
23.
___ If applicable, extend and retract manipulator full out and in 5 times, check for
proper function, check for leaks.
24.
___ WARNING: Clamp lower wrench, verify that manipulator functions do not
operate.
25. ___ Unclamp lower wrench.
26. ___ Connect test gauge to return system test port, run spinner motors and hold
while checking pressure filter bypass indicator (if applicable), and monitoring system
back pressure, not to exceed 250 psi. Record back pressure ________
27. ___ If applicable, check shutoff valve for proper function.
28. ___ Remove test gauges, and reattach cap ports.
29. ___ Install any panels / covers removed for test.
30. ___ Ensure rig personnel fully understand all functions and basic maintenance of
the FloorHand, including but not limited to: Importance of keeping fresh dies installed,
proper make up torque adjustment, proper breakout procedure. Demonstrate how to
remove and install the following: Dies, die blocks, and drive rollers.
Tech: ________________________________________
Signature: ____________________________________
Date: ________________________________________
Summary of Contents for FloorHand 9GF-1102
Page 6: ...6 DESCRIPTION DESCRIPTION...
Page 10: ...10 DESCRIPTION Figure 2 1 352 mm 53 2 in 1 488 mm 58 6 in 1 174 mm 46 2 in 2 581 mm 101 6 in...
Page 11: ...11 DESCRIPTION...
Page 12: ...12 COMMISSIONING COMMISSIONING...
Page 17: ...17 INSTALLATION INSTALLATION...
Page 24: ...24 OPERATIONS 24 OPERATIONS OPERATIONS...
Page 49: ...49 MAINTENANCE INSPECTION MAINTENANCE INSPECTION...
Page 52: ...52 MAINTENANCE INSPECTION Figure 50...
Page 57: ...57 MAINTENANCE INSPECTION Figure 54...
Page 63: ...63 SPARE PARTS SPARE PARTS...
Page 65: ...DRAWINGS 65 DRAWINGS...
Page 66: ...DRAWINGS 66 Figure 55 CANTILEVER STYLE FLOORHAND WITH 9FM 2050 HYDRAULIC CYLINDER...
Page 71: ...DRAWINGS 71 FLOORHAND COMBINATION MANIFOLD 9FH 01539 Figure 60...
Page 72: ...DRAWINGS 72 FLOORHAND RETURN MANIFOLD 9FH 01540 Figure 61...
Page 92: ...INDEX 92 INDEX...
Page 104: ...INDEX 104 W WINCH 87 WINCH ASSY HOSE FITTING KIT 87 WINCH MOUNTING PLATE 87 X Y Z...