60
MAI
N
TE
N
AN
C
E
&
IN
SP
EC
TI
O
N
Check List Category III (EVERY 3 MONTHS)
GENERAL
DESCRIPTION
CHECKED
SIGNATURE
1
Carry out a Category II inspection
Remarks
___________________________________________
________________________
SUPERVISOR
DATE
Check List Category IV (EVERY YEAR)
GENERAL
DESCRIPTION
CHECKED
SIGNATURE
1
Carry out inspection II & III
Remarks
Periodic Inspection
The recommended schedule for inspection of the FloorHand are as follows:
• Ongoing:
Inspection category I
• Daily:
Inspection category II
• Every 3 months:
Inspection category III
• Every 1 year:
Inspection category IV
The recommended frequencies apply for equipment in use during the specified period.
Summary of Contents for FloorHand 9GF-1102
Page 6: ...6 DESCRIPTION DESCRIPTION...
Page 10: ...10 DESCRIPTION Figure 2 1 352 mm 53 2 in 1 488 mm 58 6 in 1 174 mm 46 2 in 2 581 mm 101 6 in...
Page 11: ...11 DESCRIPTION...
Page 12: ...12 COMMISSIONING COMMISSIONING...
Page 17: ...17 INSTALLATION INSTALLATION...
Page 24: ...24 OPERATIONS 24 OPERATIONS OPERATIONS...
Page 49: ...49 MAINTENANCE INSPECTION MAINTENANCE INSPECTION...
Page 52: ...52 MAINTENANCE INSPECTION Figure 50...
Page 57: ...57 MAINTENANCE INSPECTION Figure 54...
Page 63: ...63 SPARE PARTS SPARE PARTS...
Page 65: ...DRAWINGS 65 DRAWINGS...
Page 66: ...DRAWINGS 66 Figure 55 CANTILEVER STYLE FLOORHAND WITH 9FM 2050 HYDRAULIC CYLINDER...
Page 71: ...DRAWINGS 71 FLOORHAND COMBINATION MANIFOLD 9FH 01539 Figure 60...
Page 72: ...DRAWINGS 72 FLOORHAND RETURN MANIFOLD 9FH 01540 Figure 61...
Page 92: ...INDEX 92 INDEX...
Page 104: ...INDEX 104 W WINCH 87 WINCH ASSY HOSE FITTING KIT 87 WINCH MOUNTING PLATE 87 X Y Z...