![Bioneer AllInOneCycler User Manual Download Page 65](http://html1.mh-extra.com/html/bioneer/allinonecycler/allinonecycler_user-manual_2754618065.webp)
AllInOneCycler
TM
/
Thermal Block
61
www.bioneer.com
BQ-042-101-01
Revision : 0(2012-12-07)
Figure 55. Pulling out the blown fuse
Figure 56. 250V, F10AL, 5x20mm fuse
(5)
Place the fuse compartment back into the power entry module and close the fuses door.
(6)
Press the fuses door until it locks in place.
(7)
Connect the instrument power cord.
4.
Returning an
All
I
nOneCycler
TM
for Service
(1)
Decontaminate the instrument.
If the bath block becomes contaminated with radioactivity, use a commercially available
decontaminant to remove the contamination. If the block cannot be decontaminated, the
instrument cannot be returned to Bioneer for service.
(2)
Complete instrument decontamination.
(3)
Fax or e-mail(
) the service request form to the customer center.
(4)
Pack the instrument in the provided packaging, without any accessories or power cords.
Include service request form in the box.
Note: Repairs for instruments without the service request form are delayed.
(5)
Affix the provided postage to the box, then ship the instrument to the designated facility. The
repair process requires 1 to 3 weeks.