Chapter 4 Getting Started
51
Chapter 4.
Getting Started
Errors in calibration or in the parameter setting may lead to incor-
rect measurement results. This may possibly lead to production
downtime or damage to the system.
To check your device settings after commissioning, we recommend
using the test settings in the Service menu to simulate the calibra-
tion points.
Wherever possible, a test run, if possible under operating condi-
tions, will provide you with a high level of security regarding the
accuracy of your calibration. This test run has to cover the entire
measuring range.
If a test run is not possible, then you should at least check the
reaction of the measurement with empty container and full con-
tainer should be simulated by closing the source shielding.
Basically, it is advisable to have commissioning carried out by the
BERTHOLD TECHNOLOGIES service.
The device is taken into operation as follows:
Turn on supply voltage
Open shielding of source (see hardware manual)
Reset values to standard values
Define basic setting for standard mode
Run calibration in standard mode
4.1
Turning On the Supply Voltage
Immediately after turning on the supply volt-
age, the device shows 4710 in the first row and
several seconds later 0 or 1 in the second row.
Another second later the display shows the code
10 (or 11); then it is ready for operation.
4710
1
Summary of Contents for LB4710-050
Page 2: ......
Page 4: ......
Page 8: ......
Page 32: ......
Page 33: ...Chapter 3 Functional Safety Mini Switch LB 471 33...
Page 34: ...Chapter 3 Functional Safety Mini Switch LB 471 34...
Page 35: ...Chapter 3 Functional Safety Mini Switch LB 471 35...
Page 44: ......
Page 58: ......
Page 98: ......
Page 104: ......
Page 110: ...Chapter 14 Certificates Mini Switch LB 471 110...
Page 111: ...Chapter 14 Certificates Mini Switch LB 471 111...
Page 112: ...Chapter 14 Certificates Mini Switch LB 471 112...
Page 113: ...Chapter 14 Certificates Mini Switch LB 471 113 14 2 ATEX Certificate NaI Detector...
Page 114: ...Chapter 14 Certificates Mini Switch LB 471 114...
Page 115: ...Chapter 14 Certificates Mini Switch LB 471 115...
Page 116: ...Chapter 14 Certificates Mini Switch LB 471 116...
Page 117: ...Chapter 14 Certificates Mini Switch LB 471 117 14 3 ATEX Certificate GM Detector...
Page 118: ...Chapter 14 Certificates Mini Switch LB 471 118...
Page 119: ...Chapter 14 Certificates Mini Switch LB 471 119 14 4 EC Declaration of Conformity...
Page 120: ......
Page 141: ...Mini Switch LB 471 141 Notes...
Page 142: ...Mini Switch LB 471 142 Notes...
Page 145: ......
Page 147: ......
Page 149: ......
Page 151: ......
Page 161: ......
Page 195: ......
Page 215: ......
Page 219: ......
Page 223: ...Mini Switch LB 471 78 Notes...
Page 224: ...Mini Switch LB 471 79 Notes...
Page 227: ...Mini Switch LB 471 82 Y Year 21 Z Zero count rate 8 30 32 58...