Chapter 5 Explanations
62
5.3
Bulk Cone Measurement
Note!
Bulk cone measurements can only be carried out with scintillation
detectors.
The required calibration has to be carried out in the professional
mode, since the limit value has to be set specifically.
With bulk goods, the monitoring level is determined at a defined
bulk cone diameter. For the measurement to work well, the count
rate at the switch point has to differ significantly from that at full
and at empty container. If the configuration has been calculated
by B
ERTHOLD
T
ECHNOLOGIES
, this has already been taken into ac-
count. The measurement configuration has to be installed at that
point where the bulk cone diameter is to be monitored.
Calibration process:
1
Determine empty count rate
2
Full count rate
3
Calibrate with code 36
4
Set switch point
There are three ways of setting the switch point:
Bulk height under operating conditions
(often not feasible for technical reasons)
Simulate bulk cone using steel or lead plates
Calculate count rate for bulk cone
Simulation with steel or lead plates is preferable to calculation.
Control bulk height under operating conditions
After the bulk height with the specified bulk cone diameter has
reached the monitoring level, read off the count rate in code 11
and enter this value in code 18.
Summary of Contents for LB4710-050
Page 2: ......
Page 4: ......
Page 8: ......
Page 32: ......
Page 33: ...Chapter 3 Functional Safety Mini Switch LB 471 33...
Page 34: ...Chapter 3 Functional Safety Mini Switch LB 471 34...
Page 35: ...Chapter 3 Functional Safety Mini Switch LB 471 35...
Page 44: ......
Page 58: ......
Page 98: ......
Page 104: ......
Page 110: ...Chapter 14 Certificates Mini Switch LB 471 110...
Page 111: ...Chapter 14 Certificates Mini Switch LB 471 111...
Page 112: ...Chapter 14 Certificates Mini Switch LB 471 112...
Page 113: ...Chapter 14 Certificates Mini Switch LB 471 113 14 2 ATEX Certificate NaI Detector...
Page 114: ...Chapter 14 Certificates Mini Switch LB 471 114...
Page 115: ...Chapter 14 Certificates Mini Switch LB 471 115...
Page 116: ...Chapter 14 Certificates Mini Switch LB 471 116...
Page 117: ...Chapter 14 Certificates Mini Switch LB 471 117 14 3 ATEX Certificate GM Detector...
Page 118: ...Chapter 14 Certificates Mini Switch LB 471 118...
Page 119: ...Chapter 14 Certificates Mini Switch LB 471 119 14 4 EC Declaration of Conformity...
Page 120: ......
Page 141: ...Mini Switch LB 471 141 Notes...
Page 142: ...Mini Switch LB 471 142 Notes...
Page 145: ......
Page 147: ......
Page 149: ......
Page 151: ......
Page 161: ......
Page 195: ......
Page 215: ......
Page 219: ......
Page 223: ...Mini Switch LB 471 78 Notes...
Page 224: ...Mini Switch LB 471 79 Notes...
Page 227: ...Mini Switch LB 471 82 Y Year 21 Z Zero count rate 8 30 32 58...