Chapter 5 Installation
50
Installation with clamps
1
Make a suitable bracket for the container.
2
Using the drawing below, drill 4 holes (d=11 mm) into the
bracket for the clamps.
3
Install the bracket either directly on the container or on a
sturdy girder.
4
Install the detector on the bracket using clamps.
Figure 11:
GM detector
mounted on bracket
Figure 12:
Examples of
installed detectors
View from above
Red marking strips for
counter tube position
Bracket
Radiation path
Summary of Contents for LB4710-050
Page 2: ......
Page 4: ......
Page 8: ......
Page 32: ......
Page 33: ...Chapter 3 Functional Safety Mini Switch LB 471 33...
Page 34: ...Chapter 3 Functional Safety Mini Switch LB 471 34...
Page 35: ...Chapter 3 Functional Safety Mini Switch LB 471 35...
Page 44: ......
Page 58: ......
Page 98: ......
Page 104: ......
Page 110: ...Chapter 14 Certificates Mini Switch LB 471 110...
Page 111: ...Chapter 14 Certificates Mini Switch LB 471 111...
Page 112: ...Chapter 14 Certificates Mini Switch LB 471 112...
Page 113: ...Chapter 14 Certificates Mini Switch LB 471 113 14 2 ATEX Certificate NaI Detector...
Page 114: ...Chapter 14 Certificates Mini Switch LB 471 114...
Page 115: ...Chapter 14 Certificates Mini Switch LB 471 115...
Page 116: ...Chapter 14 Certificates Mini Switch LB 471 116...
Page 117: ...Chapter 14 Certificates Mini Switch LB 471 117 14 3 ATEX Certificate GM Detector...
Page 118: ...Chapter 14 Certificates Mini Switch LB 471 118...
Page 119: ...Chapter 14 Certificates Mini Switch LB 471 119 14 4 EC Declaration of Conformity...
Page 120: ......
Page 141: ...Mini Switch LB 471 141 Notes...
Page 142: ...Mini Switch LB 471 142 Notes...
Page 145: ......
Page 147: ......
Page 149: ......
Page 151: ......
Page 161: ......
Page 195: ......
Page 215: ......
Page 219: ......
Page 223: ...Mini Switch LB 471 78 Notes...
Page 224: ...Mini Switch LB 471 79 Notes...
Page 227: ...Mini Switch LB 471 82 Y Year 21 Z Zero count rate 8 30 32 58...