Chapter 5 Installation
46
5.1.3
Temporary Storage of Sources
The operator has to take suitable provisions for intermediate stor-
age of sources at the place of installation between the period from
source delivery to the start of the installation work. A source may
be stored only in a lockable room which is identified accordingly.
Accessible controlled areas have to be identified and, if necessary,
secured.
5.1.4
Installation Site
Danger!
Risk of injury and damage!
Heavy system parts may fall down if not installed properly.
The carrying capacity of the container walls or the holders must be
adequate to install the source with shielding and the detector.
Free space must be foreseen at the installation site for:
Freedom of motion for delivery of shielding, detector and eval-
uation unit
Servicing and repair work, to install and dismantle parts.
The source with shielding and the detector are horizontally in-
stalled on the designated limit level on the outside of the container
and outside a possibly installed heat insulation. Any special fea-
tures at the measuring point have to be taken into account.
5.1.5
Unpacking and Cleaning System Parts
After unpacking, compare all parts with the packing list and check
if the shipment is complete and shows any sign of damage. If nec-
essary, you may have to clean parts.
If you detect any damage, notify the forwarder and the manufac-
turer immediately.
Summary of Contents for LB4710-050
Page 2: ......
Page 4: ......
Page 8: ......
Page 32: ......
Page 33: ...Chapter 3 Functional Safety Mini Switch LB 471 33...
Page 34: ...Chapter 3 Functional Safety Mini Switch LB 471 34...
Page 35: ...Chapter 3 Functional Safety Mini Switch LB 471 35...
Page 44: ......
Page 58: ......
Page 98: ......
Page 104: ......
Page 110: ...Chapter 14 Certificates Mini Switch LB 471 110...
Page 111: ...Chapter 14 Certificates Mini Switch LB 471 111...
Page 112: ...Chapter 14 Certificates Mini Switch LB 471 112...
Page 113: ...Chapter 14 Certificates Mini Switch LB 471 113 14 2 ATEX Certificate NaI Detector...
Page 114: ...Chapter 14 Certificates Mini Switch LB 471 114...
Page 115: ...Chapter 14 Certificates Mini Switch LB 471 115...
Page 116: ...Chapter 14 Certificates Mini Switch LB 471 116...
Page 117: ...Chapter 14 Certificates Mini Switch LB 471 117 14 3 ATEX Certificate GM Detector...
Page 118: ...Chapter 14 Certificates Mini Switch LB 471 118...
Page 119: ...Chapter 14 Certificates Mini Switch LB 471 119 14 4 EC Declaration of Conformity...
Page 120: ......
Page 141: ...Mini Switch LB 471 141 Notes...
Page 142: ...Mini Switch LB 471 142 Notes...
Page 145: ......
Page 147: ......
Page 149: ......
Page 151: ......
Page 161: ......
Page 195: ......
Page 215: ......
Page 219: ......
Page 223: ...Mini Switch LB 471 78 Notes...
Page 224: ...Mini Switch LB 471 79 Notes...
Page 227: ...Mini Switch LB 471 82 Y Year 21 Z Zero count rate 8 30 32 58...