893-878-B
3-1
Chapter 3
Preparing To Install the Model 58000
This chapter discusses the procedures required to prepare for the installation of
the Model 58000 switch into a Model 500x chassis.
This chapter covers the following topics:
•
Package contents of the Model 58000 switch
•
Guidelines for unpacking the Model 58000 switch
•
Configuration jumper settings
•
Tools and equipment required for installation
Package Contents
The package contents of the Model 58000 switch include the following items:
•
Model 58000 switch, with four captive retaining screws
•
Pan-head screws
•
Four 10BASE-T crossover cables
•
This guide
•
Warranty card
Guidelines for Unpacking the Model 58000 Switch
Electrostatic discharge can damage the components on circuit boards. When
you unpack the Model 58000 switch, take the following precautions to prevent
damage to the board:
•
Do not remove the board from its antistatic plastic bag until you are ready
to install it.
•
Do not touch pins, leads, or solder connections.
•
Handle the board by the edges only, and avoid touching the backplane
connector area.
•
Store or ship the board and components in antistatic packaging.
893-878-B Book Page 1 Monday, May 12, 1997 2:06 PM
Summary of Contents for 58000
Page 4: ...iv 893 878 B 893 878 B Book Page iv Monday May 12 1997 2 06 PM ...
Page 12: ...xii 893 878 B 893 878 B Book Page xii Monday May 12 1997 2 06 PM ...
Page 14: ...xiv 893 878 B 893 878 B Book Page xiv Monday May 12 1997 2 06 PM ...
Page 22: ...893 878 B Book Page xxii Monday May 12 1997 2 06 PM ...
Page 38: ...893 878 B Book Page 16 Monday May 12 1997 2 06 PM ...
Page 90: ...893 878 B Book Page 4 Monday May 12 1997 2 06 PM ...
Page 100: ...893 878 B Book Page 10 Monday May 12 1997 2 06 PM ...
Page 106: ...893 878 B Book Page 6 Monday May 12 1997 2 06 PM ...
Page 144: ...893 878 B Book Page 38 Monday May 12 1997 2 06 PM ...
Page 152: ...893 878 B Book Page 4 Monday May 12 1997 2 06 PM ...