![Baxi ECOGEN 24/1.0 Installation & Servicing Instructions Manual Download Page 65](http://html1.mh-extra.com/html/baxi/ecogen-24-1-0/ecogen-24-1-0_installation-and-servicing-instructions-manual_2711788065.webp)
Fig. 68
14.17 PCB (G83/24Vdc Power Supply) (
1. Remove the control cover as detailed in
2. Carefully remove the four connections.
3. Remove the screw from the back left hand corner. Push the G83 assembly back (approx 10mm) and lift out.
4. Reassemble in the reverse order.
14.18 EMC Mains Filter (
1. Undo the 4 screws from the bottom cover and remove the cover.
2. Undo the 2 screws securing the control tray, pull the assembly forward and carefully allow the assembly to drop down.
3. Remove the Mains connections from either side of the filter.
4. Undo the screws securing the filter to the underside of the panel (
). Remove the earth tag.
5. Reassemble in reverse order ensuring that the earth tag is in place.
Fig. 69 Fig. 71
page 66
14.19 Gas Valves (
IMPORTANT: After replacing the valve the CO2 must be checked and adjusted as detailed in
Combustion Check.
Only change the valve if a suitable calibrated combustion analyser is available, operated by a competent person see
Summary of Contents for ECOGEN 24/1.0
Page 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Page 70: ...page 70 16 2 Milligrid 24 way Connector...
Page 71: ...page 71 16 3 14 way Connector...
Page 72: ...page 72 16 4 Engine Circuit...
Page 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Page 74: ...page 74 16 6 External Connections External Wiring...
Page 85: ...page 87...
Page 86: ...page 88...
Page 87: ...page 89 Section P...
Page 88: ...page 90...
Page 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Page 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Page 92: ...page 97...