Legislation
This company declares that no substances harmful to health are contained in the appliance or used during appliance manufacture.
The appliance is suitable only for installation in GB and IE and should be installed in accordance with the rules in force, and only used in a suitably ventilated location.
In GB, the gas installation must be carried out by a Gas Safe
Registered Installer. It must be carried out in accordance with the relevant requirements of the:
Gas Safety (Installation & Use) Regulations.
The appropriate Building Regulations either The Building Regulations, The Building Regulations (Scotland), Building Regulations (Northern Ireland).
The Water Fittings Regulations or Water Byelaws in Scotland.
The Current I.E.E. Wiring Regulations. section 15/87 (G83/1)
Energy Networks Association Engineering Recommendation G83/1: The recommendations for the connection of Small Scale Embedded Generators (up to 16A per phase)
in parallel with Low Voltage Distribution Networks
Where no specific instructions are given, reference should be made to the relevant British Standard Code of Practice.
In IE, the installation must be carried out by a competent Person and installed in accordance with the current edition of I.S. 813 'Domestic Gas Installations', the current Building
Regulations and reference should be made to the current ETCI rules for electrical installation.
All systems must be thoroughly flushed and treated with inhibitor (see
).
Codes of Practice refer to the most recent version
In GB the following Codes of Practice apply:
Standard
Scope
BS 5482 Part 1 Butane & Propane Gas Installation.
BS 6891
Gas Installation.
BS 5546
Installation of hot water supplies for domestic purposes.
Summary of Contents for ECOGEN 24/1.0
Page 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Page 70: ...page 70 16 2 Milligrid 24 way Connector...
Page 71: ...page 71 16 3 14 way Connector...
Page 72: ...page 72 16 4 Engine Circuit...
Page 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Page 74: ...page 74 16 6 External Connections External Wiring...
Page 85: ...page 87...
Page 86: ...page 88...
Page 87: ...page 89 Section P...
Page 88: ...page 90...
Page 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Page 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Page 92: ...page 97...