Advise the customer of the necessity of informing the electricity provider with regard to billing and payback. See the Users Operating instructions section 13.3.
NOTE: See also www.baxi.co.uk/products/getfitwithbaxiecogen
page 57
13.0 Servicing
13.1 General
1. For reasons of safety and economy, it is recommended that the appliance is serviced annually. Servicing must be performed by a competent person in accordance with
BS 79674:2007.
2. After servicing, complete the relevant
Benchmark Commissioning Checklist
at the rear of this publication.
NOTE: Service and maintenance engineers must have undergone Baxi Ecogen Training and been approved to service this appliance.
3. Before electrically isolating the appliance: remove all demands for heat and ensure the engine has disconnected from the grid. (Power = 0 kW) This will protect the engine
from the stresses produced by disconnecting during electricity generation.
IMPORTANT:
During routine servicing, and after any maintenance or change
of part of the combustion circuit, the following must be checked:
The integrity of the complete flue system and the flue seals.
The integrity of the boiler combustion circuit and relevant seals as described in
The operational gas inlet pressure as described in
and the gas rate as described in 11.3.8.
The combustion performance as described in 'Check the Combustion Performance' (
).
4. Competence to carry out Checking Combustion Performance
B.S. 6798 'Specification for Installation & Maintenance of Gas Fired Boilers not exceeding 70kW' advises that:
The person carrying out a combustion measurement should have been assessed as competent in the use of a flue gas analyser and the interpretation of the results.
The flue gas analyser used should be one meeting the requirements of BS7927 or BSEN503793 and be calibrated in accordance with the analyser manufacturers'
requirements.
Competence can be demonstrated by satisfactory completion of the CPA1 ACS assessment, which covers the use of electronic portable combustion gas analysers in
accordance with BS 7967, Parts 1 to 4.
NOTE: It is not possible to undertake any servicing of the engine and its burner and as such it should be regarded as a sealed unit.
When performing combustion checks each burner must be run independently, see
Fig. 50
13.2 Power generation
1. Ensure the system is cold and use the chimney sweep mode to force the Engine burner to maximum rate see
2. Use the THINK Controller to observe the power generated.
3. Monitor the head temperature and the power via the Ithink controller see
safety note.
4. The power should be between 800 to 1000W within 10 minutes of the engine burner starting the head temperature should be between 450500 deg C.
5. If the power level is low when the head has reached temperature the engine is not producing power correctly
for fault finding on the engine.
Summary of Contents for ECOGEN 24/1.0
Page 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Page 70: ...page 70 16 2 Milligrid 24 way Connector...
Page 71: ...page 71 16 3 14 way Connector...
Page 72: ...page 72 16 4 Engine Circuit...
Page 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Page 74: ...page 74 16 6 External Connections External Wiring...
Page 85: ...page 87...
Page 86: ...page 88...
Page 87: ...page 89 Section P...
Page 88: ...page 90...
Page 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Page 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Page 92: ...page 97...