* A THINK Controller here implies that the RF facility is not being used the customer has reverted to an all wired system
All RF connections or mixed with the user reset off appliance
NOTE: Either a 5 LED Receiver or a THINK Controller must be fitted to the appliance for the safety of the user or visiting service personnel.
page 15
7.0 Site Requirements
7.1 Location
1. Must not be located in a living space (recommend locations, garage, utility, and outhouse).
2. There must be sufficient space at the installation location and in the route to the location for maneuvering and operating the lifting equipment (Genie GL8 lifting equipment
dimensions are 64cm wide x 175cm high x 95cm deep). This space must be maintained for future access of the lifting equipment for maintenance.
3. Wall structure must be a solid flat load bearing wall of brick or block. Partition and timber frame walls, and dot and dab plaster board are not suitable. If in doubt consult a
Structural Engineer.
4. To eliminate the transmission of noise from the appliance and its pipework it is recommended that the central heating pipework is adequately routed and clipped so that
contact between the structure of the building and pipework is eliminated.
Fig. 9
Ensure that there is adequate clearance for the lifting equipment. (Genie GL8 lifting equipment dimensions are 64cm wide x 175cm high x 95cm deep).
Summary of Contents for ECOGEN 24/1.0
Page 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Page 70: ...page 70 16 2 Milligrid 24 way Connector...
Page 71: ...page 71 16 3 14 way Connector...
Page 72: ...page 72 16 4 Engine Circuit...
Page 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Page 74: ...page 74 16 6 External Connections External Wiring...
Page 85: ...page 87...
Page 86: ...page 88...
Page 87: ...page 89 Section P...
Page 88: ...page 90...
Page 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Page 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...