![Baxi ECOGEN 24/1.0 Installation & Servicing Instructions Manual Download Page 24](http://html1.mh-extra.com/html/baxi/ecogen-24-1-0/ecogen-24-1-0_installation-and-servicing-instructions-manual_2711788024.webp)
AIR DUCT
Equivalent
Length Value
No of
fittings/pipes
Sub total
1m extension
1m
5
5.0m
135° bend
0.25m
2
0.5m
91.5° bend
0.5m
2
1.0m
Equivalent Length Air Duct = 6.5m
FLUE DUCT
Equivalent
Length Value
No of
fittings/pipes
Sub total
1m extension
1m
5
5.0m
135° bend
0.25m
2
0.5m
91.5° bend
0.5m
2
1.0m
Equivalent Length Flue Duct = 6.5m
page 25
8.3 Flue Accessories
Key
Accessory
Size
Code No
FLUE GROUP A
Concentric Flue System 100mm diameter
A3
Telescopic Internal Flue Kit
315500mm
5119654
A2
Telescopic Flue (incl elbow)
5118069
A
Horizontal Flue Terminal (incl elbow)
5118489
B
Flue Extension
1000mm
5111074
C
Flue Bend
93°
5111075
D
Flue Bend (pair)
135°
5111085
U
Pipe Support (painted)
100mm Ø
5111080
P
Wall Liner
5111067
S
Flue Terminal Deflector
5111068
FLUE GROUP N
Twin Flue System 80mm diameter
E
Flue Extension (pair)
1000mm
5111087
F
Flue Bend (pair)
90°
5111072
G
Flue Bend (2 pair)
135°
5111086
J
Vertical Flue Boiler Adaptor Kit
5111079
H
Vertical Flue Adaptor
5111084
W
Pipe Support (pair)
80mm
5111081
FLUE GROUP A, N, G
Vertical Flue Kits
K
Vertical Flue Terminal (80/125 use with Item H)
5111078
K1
Vertical Flue Terminal (60/100)
5118576
L
Pitch Roof Flashing
25°/50°
5122151
M
Roof Cover Plate
246143
N
Flat Roof Flashing
246144
Summary of Contents for ECOGEN 24/1.0
Page 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Page 70: ...page 70 16 2 Milligrid 24 way Connector...
Page 71: ...page 71 16 3 14 way Connector...
Page 72: ...page 72 16 4 Engine Circuit...
Page 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Page 74: ...page 74 16 6 External Connections External Wiring...
Page 85: ...page 87...
Page 86: ...page 88...
Page 87: ...page 89 Section P...
Page 88: ...page 90...
Page 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Page 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Page 92: ...page 97...