![Baxi ECOGEN 24/1.0 Installation & Servicing Instructions Manual Download Page 47](http://html1.mh-extra.com/html/baxi/ecogen-24-1-0/ecogen-24-1-0_installation-and-servicing-instructions-manual_2711788047.webp)
page 46
10.12 THINK Controller, 5 LED Receiver and Wall Cradle Accessory (
Display Descriptions
Burner in Operation 1 Engine 2 Supplementary
Heating to the Comfort Set Point
Heating to the Reduced Set Point
Central Heating Times Active
DHW Times Active
Combustion Check Function Active
Holiday Function Active
Manual Override Time Switch Function Overridden
Time Switch Function Active
Wireless Communication Established
THINK Controller Configured as a Room Sensor
Error Message
Stand By Appliance On/Off
Outdoor Sensor Connected
System / Appliance Attention Required
Maintenance / Special Mode
Change Battery (only if radio control fitted)
1. The THINK Controller is effectively an interface which allows the householder to programme the appliance to provide the desired comfort levels for the central heating and
hot water. It also gives information on the appliance error codes electrical power generated etc.
2. Whilst the THINK Controller is on the appliance the standard screen displays the appliance flow temperature. External sensors/room thermostats can be connected to
monitor and control the room and domestic hot water temperatures see
3. The THINK Controller may be removed from the appliance and configured as a programmable room sensor in which case the standard screen displays the room
temperature.
4. If the THINK Controller is to be used as a room sensor it must be configured so that the appliance will recognise it as such.
Display showing all available segments
Summary of Contents for ECOGEN 24/1.0
Page 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Page 70: ...page 70 16 2 Milligrid 24 way Connector...
Page 71: ...page 71 16 3 14 way Connector...
Page 72: ...page 72 16 4 Engine Circuit...
Page 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Page 74: ...page 74 16 6 External Connections External Wiring...
Page 85: ...page 87...
Page 86: ...page 88...
Page 87: ...page 89 Section P...
Page 88: ...page 90...
Page 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Page 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Page 92: ...page 97...