![Baxi ECOGEN 24/1.0 Installation & Servicing Instructions Manual Download Page 45](http://html1.mh-extra.com/html/baxi/ecogen-24-1-0/ecogen-24-1-0_installation-and-servicing-instructions-manual_2711788045.webp)
page 44
10.10 SPlan with 2nd Heating Circuit
1. The appliance MUST have a permanent Live/Neutral/Earth connection. The pump must be connected to the appliance as shown.
2. Set parameter 5700 to '3' for two heating circuits see
3. To control the second heating circuit a second THINK Controller is required this is available as an optional extra. For guidance on installing the second THINK Controller
see
Use either a cylinder sensor or thermostat as in
Summary of Contents for ECOGEN 24/1.0
Page 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Page 70: ...page 70 16 2 Milligrid 24 way Connector...
Page 71: ...page 71 16 3 14 way Connector...
Page 72: ...page 72 16 4 Engine Circuit...
Page 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Page 74: ...page 74 16 6 External Connections External Wiring...
Page 85: ...page 87...
Page 86: ...page 88...
Page 87: ...page 89 Section P...
Page 88: ...page 90...
Page 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Page 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Page 92: ...page 97...