![Baxi ECOGEN 24/1.0 Installation & Servicing Instructions Manual Download Page 61](http://html1.mh-extra.com/html/baxi/ecogen-24-1-0/ecogen-24-1-0_installation-and-servicing-instructions-manual_2711788061.webp)
Fig. 61 & Fig. 62
14.10 Supplementary Burner/Heat Exchanger Insulation (
1. Remove the electrode leads, noting their positions. Also remove the electrodes as described in
2. Undo the screws securing the manifold to the venturi and the nuts holding the burner door to the heat exchanger. Draw the assembly away from the heat exchanger.
3. Inspect and remove the burner door insulation.
4. Fit the new insulation carefully over the burner and align it with the slots for the electrodes.
5. Inspect the rear insulation, replace if cracked or broken. It is retained by a small screw and a large washer. Undo the screw carefully, remove the insulation and fit new
insulation. Clean any debris from the heat exchanger preferably with a vacuum cleaner.
6. Examine the burner door seal and replace if necessary.
7. Reassemble in reverse order.
page 63
14.11 Central Heating Flow & Return Temperature Sensors (
&
)
1. Disconnect the connections.
2. Remove the retaining screws
3. Fit new sensor and reassemble in the reverse order.
14.12 Overheat Thermostat (
1. Pull the connectors off the thermostat.
Summary of Contents for ECOGEN 24/1.0
Page 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Page 70: ...page 70 16 2 Milligrid 24 way Connector...
Page 71: ...page 71 16 3 14 way Connector...
Page 72: ...page 72 16 4 Engine Circuit...
Page 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Page 74: ...page 74 16 6 External Connections External Wiring...
Page 85: ...page 87...
Page 86: ...page 88...
Page 87: ...page 89 Section P...
Page 88: ...page 90...
Page 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Page 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Page 92: ...page 97...