1. Turn the gas cock off.
2. Undo the screw holding the electrical connector in place and detach. Remove the earth lead and sensing tube.
3. Remove the screws securing the valve to its bracket.
4. Undo the nuts either side of gas valve. Ease the upper pipe aside and remove the gas valve.
5. Inspect the washers either side of the valve and replace if necessary.
6. Reassemble in reverse order.
14.20 Condensate trap (
1. Remove the case front and the bottom cover as detailed in
2. Unscrew the condensate removal pipe from the bottom of the trap.
3. Slacken the two self tapping screws holding the condensate trap in place.
4. Twist the body anti clockwise and lower the trap until the electrical connections are visible between the gas valve brackets. Detach the push on connections noting their
positions.
5. Withdraw the condensate trap noting its orientation.
6. Replace in the reverse order.
14.21 Overcurrent switch (
)
1. Remove the case front and the bottom cover as detailed in
2. Lower the control tray by removing the screws at either side.
3. Remove the control cover by undoing the two screws at the left hand corners.
4. Remove the 4 push on connections from the back of the switch noting their positions.
5. Observe the orientation of the switch. Extract the switch from the panel.
6. Replace in the reverse order. Refer to
for the electrical connections.
7. Ensure the switch is pressed up at the back ie. the '1' is depressed.
Fig. 72 & Fig. 73
Summary of Contents for ECOGEN 24/1.0
Page 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Page 70: ...page 70 16 2 Milligrid 24 way Connector...
Page 71: ...page 71 16 3 14 way Connector...
Page 72: ...page 72 16 4 Engine Circuit...
Page 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Page 74: ...page 74 16 6 External Connections External Wiring...
Page 85: ...page 87...
Page 86: ...page 88...
Page 87: ...page 89 Section P...
Page 88: ...page 90...
Page 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Page 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Page 92: ...page 97...