6. Physical installation stand alone cooler
1m
1f
1a
1b 2m
2f
2a
2b
1f 1m
2f 2m
1a 1b
2b 2a
Image 6-20
Cabling & tubing
Cabling
From projector connector plate
To cooler
XLR cable 1
1a
1a
Control cable 1
1b
1b
XLR cable 1
2f
2m
Control cable 2
2b
2b
6.10 Mount protection grid for the LCM cooler modules (option)
General
An metal grid (with two
fi
xing screws) is provided in the delivery package. This optional grid can be use to protect the radiators from
damage due to direct blows or falling objects and such.
1
3
2
Image 6-21
1
Metal grille
2
Fixation tabs
3
Screws
R5906753 DPXK BLP SERIES 20/11/2017
61
Summary of Contents for DP2K-17BLP
Page 4: ......
Page 8: ...Table of contents 4 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 30: ...3 Installation process 26 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 40: ...4 Physical installation projector 36 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 120: ...10 Communicator Touch Panel Image 10 7 Connections 116 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 152: ...14 Maintenance 148 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 162: ...16 Color calibration 158 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 176: ...18 Specifications 172 R5906753 DPXK BLP SERIES 20 11 2017 ...