5. Physical installation top cooler
Image 5-18
2. Remove the cooler units again.
3. Take both removed screws during the start of the assembling procedure and reuse them as
fi
xation screws for the cooler units.
4. Slide in the cooler units again and
fi
xate with both removed screws.
5.6
Mount the
fi
lters
Necessary tools
Flat screw driver (if screws are too dif
fi
cult to loosen by hand)
Necessary parts
2 x
fi
lters
How to insert
1. Turn out both screws and remove the cover plate.
Image 5-19
2. Slide in a
fi
lter.
Look to the air
fl
ow sticker for the correct orientation. Air
fl
ow is up.
48
R5906753 DPXK BLP SERIES 20/11/2017
Summary of Contents for DP2K-17BLP
Page 4: ......
Page 8: ...Table of contents 4 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 30: ...3 Installation process 26 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 40: ...4 Physical installation projector 36 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 120: ...10 Communicator Touch Panel Image 10 7 Connections 116 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 152: ...14 Maintenance 148 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 162: ...16 Color calibration 158 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 176: ...18 Specifications 172 R5906753 DPXK BLP SERIES 20 11 2017 ...