5. Physical installation top cooler
x 3
Image 5-7
5. Slide both top plates as indicated into the grooves. Slide until you reach the position plate and the hole matches the hole in the
brackets. Use one screw (M3) on each side of the top plates and tighten them fully until the brackets are pushed strongly against
the ribs in the cover and middle bracket.
Tip:
Put in place the screws, without tightening them, before slide the top plates. It is more easy to positioning the screws
when the top plates are not in place.
Image 5-8
6. Hook the middle bracket support into the middle bracket.
Turn in the
fi
xation screw (M4).
42
R5906753 DPXK BLP SERIES 20/11/2017
Summary of Contents for DP2K-17BLP
Page 4: ......
Page 8: ...Table of contents 4 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 30: ...3 Installation process 26 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 40: ...4 Physical installation projector 36 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 120: ...10 Communicator Touch Panel Image 10 7 Connections 116 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 152: ...14 Maintenance 148 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 162: ...16 Color calibration 158 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 176: ...18 Specifications 172 R5906753 DPXK BLP SERIES 20 11 2017 ...