5. Physical installation top cooler
Image 5-4
2. Slide the front plate with both
fi
xation brackets fully on both side covers.
Turn in the 4 set screws (M3) and tighten them fully until the brackets are pushed strongly against the ribs in the cover.
Note:
There may be paint job markings left on the internal side of the side covers (e.g. in the grooves for the positioning pin).
These markings are no thread nor should they be mistaken for such.
40
R5906753 DPXK BLP SERIES 20/11/2017
Summary of Contents for DP2K-17BLP
Page 4: ......
Page 8: ...Table of contents 4 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 30: ...3 Installation process 26 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 40: ...4 Physical installation projector 36 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 120: ...10 Communicator Touch Panel Image 10 7 Connections 116 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 152: ...14 Maintenance 148 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 162: ...16 Color calibration 158 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 176: ...18 Specifications 172 R5906753 DPXK BLP SERIES 20 11 2017 ...