5. Physical installation top cooler
1
2
1
2
Image 5-16
How to mount
1. Slide the
fi
rst cooler unit in the cooler housing.
3
Image 5-17
2. Slide the second cooler unit in the cooler housing.
3. Fixate both units by closing the both captive screws (reference 3).
Note:
When sliding in the cooler units, it is possible that the captive screw cannot be closed. See work around.
Work around for captive screw
1. Remove the captive screws of both cooler units.
R5906753 DPXK BLP SERIES 20/11/2017
47
Summary of Contents for DP2K-17BLP
Page 4: ......
Page 8: ...Table of contents 4 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 30: ...3 Installation process 26 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 40: ...4 Physical installation projector 36 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 120: ...10 Communicator Touch Panel Image 10 7 Connections 116 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 152: ...14 Maintenance 148 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 162: ...16 Color calibration 158 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 176: ...18 Specifications 172 R5906753 DPXK BLP SERIES 20 11 2017 ...