5. Physical installation top cooler
Image 5-20
3. Place the cover plate back on its location and drive in both
fi
xation screws by hand.
Note:
Please, don’t use any tool! Only hand tighten these screws.
5.7
Cabling and tubing
Always connect the right cooler with right group of connectors at the backside of the projector. Connect the
left cooler with the left group of connectors at the backside of the projector.
Tubing
From projector connector plate
To cooler
Tube 1
1f
1m
Tube 2
1m
1f
Tube 3
2f
2m
Tube 4
2m
2f
1m
1f
1a
1b 2m
2f
2a
2b
1f 1m
2f 2m
1a 1b
2b 2a
Image 5-21
Cabling & tubing
Cabling
From projector connector plate
To cooler
XLR cable 1
1a
1a
R5906753 DPXK BLP SERIES 20/11/2017
49
Summary of Contents for DP2K-17BLP
Page 4: ......
Page 8: ...Table of contents 4 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 30: ...3 Installation process 26 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 40: ...4 Physical installation projector 36 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 120: ...10 Communicator Touch Panel Image 10 7 Connections 116 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 152: ...14 Maintenance 148 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 162: ...16 Color calibration 158 R5906753 DPXK BLP SERIES 20 11 2017 ...
Page 176: ...18 Specifications 172 R5906753 DPXK BLP SERIES 20 11 2017 ...