Section 1
Receiving & Inspection
Receiving & Inspection 1-1
MN1230
Receiving & Inspection
Baldor Controls are thoroughly tested at the factory and carefully packaged for shipment.
When you receive your control, there are several things you should do immediately.
1.
Observe the condition of the shipping container and report any damage
immediately to the commercial carrier that delivered your control.
2.
Remove the Control from the shipping container and remove all packing
materials. The container and packing materials may be retained for future
shipment.
3.
Verify that the part number of the control you received is the same as the part
number listed on your purchase order.
4.
Inspect the control for external physical damage that may have been sustained
during shipment and report any damage immediately to the commercial carrier
that delivered your control.
5.
If the control is to be stored for several weeks before use, be sure that it is
stored in a location that conforms to published storage humidity and
temperature specifications. (Refer to Section 7 of this manual).
Summary of Contents for 29M
Page 1: ...Series 29M Servo Control Installation Operating Manual 1 98 MN1230 AC SERVO DRIVE...
Page 5: ...Section 1 General Information iv Table of Contents MN1230...
Page 7: ...Section 1 General Information 1 2 Receiving Inspection MN1230...
Page 45: ...Section 1 General Information 3 34 Installation MN1230...
Page 94: ...Section 1 General Information Specifications and Product Data 7 7 MN1230 Dimensions...
Page 102: ...Appendix B Appendix B 1 MN1230...