![Azbil SLX 110 User Manual Download Page 74](http://html1.mh-extra.com/html/azbil/slx-110/slx-110_user-manual_3042728074.webp)
Operation
Azbil Corporation
2-34
Model SLX 110/120 - Smart displacement type level transmitter
Step
Button
Procedure
SFC screen
2
H
NEXT
or
L
PREV
press [NEXT] or [PREV] to go to the
torque tube temperature reading screen.
SLX CONFIG
TQTUBE TEMP ?
3
ENTER
( Yes )
NON-VOL
Press [ENTER].
TQTUBE TEMP
WORKING...
4
CLR
( No )
Displays the current torque tube
temperature.
Updated approximately every 6
seconds.
Pressing [CLR] twice sets the mode
back to the “Please perform next
operation” state.
TQTUBE TEMP
152.3 C
Summary of Contents for SLX 110
Page 1: ...Smart Displacement type Level Transmitter Model SLX 110 120 User s Manual CM2 SLX100 2001...
Page 4: ......
Page 8: ...iv Model SLX 110 120 Smart displacement type level transmitter...
Page 120: ...Operation Azbil Corporation 2 80 Model SLX 110 120 Smart displacement type level transmitter...
Page 150: ...Maintenance Azbil Corporation 3 30 Model SLX 110 120 Smart displacement type level transmitter...
Page 162: ...Azbil Corporation 5 2 Model SLX 110 120 Smart displacement type level transmitter...
Page 163: ......
Page 166: ......
Page 168: ......