A-Series Dobby Loom Assembly Manual
Maintaining Yo
2)
3)
4)
Figure
M
AINTAINING
1)
2)
3)
4)
5)
Series Dobby Loom Assembly Manual
Maintaining Your System
Start at 40 to 50 PSI. You may wish to change this adjustment
when you change weaving patterns as you w
pressure is
The cylinder can now be
speed of how quickly
be further altered by
The left
the rod in the cylinder.
Figure 151 - FRL Detail (may vary)
AINTAINING
Check the FRL weekly (if you use your loom daily).
Drain the filter bowl if you note a build up of condensation.
a drain plug at the bottom of the bowl.
Wipe the shuttle box slide rods clean of lint.
Wipe the picker slide rods clean of lint regularly.
The shift handle may get sticky after a while.
can be applied to the pivot mechanism. Periodically blowing or
brushing lint
Series Dobby Loom Assembly Manual
ur System
Start at 40 to 50 PSI. You may wish to change this adjustment
you change weaving patterns as you w
pressure is needed when you are lifting more harnesses.
The cylinder can now be
speed of how quickly
be further altered by
The left valve adjusts inward and the right valve adjusts outward of
the rod in the cylinder.
FRL Detail (may vary)
AINTAINING
Y
OUR
Check the FRL weekly (if you use your loom daily).
Drain the filter bowl if you note a build up of condensation.
a drain plug at the bottom of the bowl.
Wipe the shuttle box slide rods clean of lint.
Wipe the picker slide rods clean of lint regularly.
The shift handle may get sticky after a while.
applied to the pivot mechanism. Periodically blowing or
brushing lint out is recommended.
Series Dobby Loom Assembly Manual
Start at 40 to 50 PSI. You may wish to change this adjustment
you change weaving patterns as you w
needed when you are lifting more harnesses.
The cylinder can now be activated by depressing the foot valve. The
speed of how quickly the harnesses lift (your weaving speed) can
be further altered by adjusting
valve adjusts inward and the right valve adjusts outward of
the rod in the cylinder.
FRL Detail (may vary)
OUR
S
YSTEM
Check the FRL weekly (if you use your loom daily).
Drain the filter bowl if you note a build up of condensation.
a drain plug at the bottom of the bowl.
Wipe the shuttle box slide rods clean of lint.
Wipe the picker slide rods clean of lint regularly.
The shift handle may get sticky after a while.
applied to the pivot mechanism. Periodically blowing or
out is recommended.
Start at 40 to 50 PSI. You may wish to change this adjustment
you change weaving patterns as you w
needed when you are lifting more harnesses.
activated by depressing the foot valve. The
harnesses lift (your weaving speed) can
adjusting the flow co
valve adjusts inward and the right valve adjusts outward of
FRL Detail (may vary)
YSTEM
Check the FRL weekly (if you use your loom daily).
Drain the filter bowl if you note a build up of condensation.
a drain plug at the bottom of the bowl.
Wipe the shuttle box slide rods clean of lint.
Wipe the picker slide rods clean of lint regularly.
The shift handle may get sticky after a while.
applied to the pivot mechanism. Periodically blowing or
out is recommended.
Appendix II: Air Assist Options
Start at 40 to 50 PSI. You may wish to change this adjustment
you change weaving patterns as you will find that a higher
needed when you are lifting more harnesses.
activated by depressing the foot valve. The
harnesses lift (your weaving speed) can
the flow control valves.
valve adjusts inward and the right valve adjusts outward of
Check the FRL weekly (if you use your loom daily).
Drain the filter bowl if you note a build up of condensation.
a drain plug at the bottom of the bowl.
Wipe the shuttle box slide rods clean of lint.
Wipe the picker slide rods clean of lint regularly.
The shift handle may get sticky after a while.
applied to the pivot mechanism. Periodically blowing or
Appendix II: Air Assist Options
Start at 40 to 50 PSI. You may wish to change this adjustment
ill find that a higher
needed when you are lifting more harnesses.
activated by depressing the foot valve. The
harnesses lift (your weaving speed) can
ntrol valves.
valve adjusts inward and the right valve adjusts outward of
Check the FRL weekly (if you use your loom daily).
Drain the filter bowl if you note a build up of condensation.
Wipe the picker slide rods clean of lint regularly.
The shift handle may get sticky after a while. A lubricating spray
applied to the pivot mechanism. Periodically blowing or
Appendix II: Air Assist Options
Page |
Start at 40 to 50 PSI. You may wish to change this adjustment
ill find that a higher
needed when you are lifting more harnesses.
activated by depressing the foot valve. The
harnesses lift (your weaving speed) can
valve adjusts inward and the right valve adjusts outward of
Drain the filter bowl if you note a build up of condensation. There's
A lubricating spray
applied to the pivot mechanism. Periodically blowing or
Appendix II: Air Assist Options
Page | 163
ill find that a higher
activated by depressing the foot valve. The
harnesses lift (your weaving speed) can
valve adjusts inward and the right valve adjusts outward of
There's
A lubricating spray