
A-Series Dobby Loom Assembly Manual
Introductory Information
Introductory Information
Page | i
Introductory Information ................................................................................................................ 1
Safety .......................................................................................................................................... 2
Introduction ................................................................................................................................. 4
Loom Features ............................................................................................................................ 4
Basics of Assembly ..................................................................................................................... 7
the Loom ..................................................................................................................................... 8
Frame Assembly ........................................................................................................................... 11
Loom Orientation ...................................................................................................................... 12
Tools Needed For Assembly ..................................................................................................... 12
Unpacking ................................................................................................................................. 13
Hardware Identification ............................................................................................................ 14
Side Frame Assembly ............................................................................................................... 16
Joining Side Frames .................................................................................................................. 21
Installing Treadles ..................................................................................................................... 23
Treadle Pulley Support (#12) .................................................................................................... 24
Installation of the E-Lift............................................................................................................ 26
Spring Lever / Spring Perch Assembly (#11) ........................................................................... 29
Squaring and Leveling the Frame ............................................................................................. 31
Install the Inner Workings ............................................................................................................ 33
Harness Pulley Support (#10) ................................................................................................... 34
Dobby Head Installation ........................................................................................................... 35
Treadle Tie-Up .......................................................................................................................... 40
Setting up the E-Lift Cables ...................................................................................................... 45
Attaching the Harness Cables ................................................................................................... 49
Heddles ..................................................................................................................................... 52
Installing Beams And Rollers ....................................................................................................... 59
Warp Beams .............................................................................................................................. 60
Install the Lower Warp Beam ................................................................................................... 61
Install the Upper Warp Beam ................................................................................................... 62
Installing the Separation Roller (#39) ....................................................................................... 63
Tension Arm Installation .......................................................................................................... 63
Installing the Cloth Beam ......................................................................................................... 71
Cloth Storage System ................................................................................................................ 72
Temple System (To Prevent Draw-In) ...................................................................................... 80