MDF connections to stations and the public switched telephone network
62 Installing and Connecting the MDF and Telephones
Installing and administering the patch cord/jumper
Before starting the patch cord installation, obtain a copy of the Port Assignment Record forms
from the customer or marketing representative. See
Figure 25: Port Assignment Record
Form
on page 53.
The white label identifying the terminal block row associated with circuits 17 to 24 connects to
an identically labeled terminal block row at the satellite closet. See
Figure 29: Example 3-pair
labeling to information outlet
on page 63. This is always the case for either 1-point or 2-point
administration.
The satellite symbol must be installed at all connection points between the blue field and the
information outlet. It must also be installed at the information outlet itself.
Figure 30: Example 4-pair labeling to information outlet
on page 64 shows an example labeling
scheme for 4-pair circuits from the equipment room to the information outlets. The labeling
scheme for 3-pair circuits from the MDF to a satellite location.
Summary of Contents for 03-300686
Page 1: ...Installing and Connecting the MDF and Telephones 03 300686 Issue 3 Release 5 0 January 2008 ...
Page 8: ...Contents 8 Installing and Connecting the MDF and Telephones ...
Page 28: ...Installing the main distribution frame 28 Installing and Connecting the MDF and Telephones ...
Page 32: ...Installing the patch panel 32 Installing and Connecting the MDF and Telephones ...
Page 40: ...Media gateway connections to the MDF 40 Installing and Connecting the MDF and Telephones ...
Page 53: ...Completing a provisioning plan Issue 3 January 2008 53 Figure 25 Port Assignment Record Form ...
Page 156: ...156 Installing and Connecting the MDF and Telephones Index ...