59
Figure 27: Typical power and ground for a DC power cabinet
Note:
Note:
For a high-rise building, connect the CBC to an approved building ground on
each floor.
Note:
Note:
Below is general information for installing the CBC in all installations having
exposed facilities.
Figure notes:
1. Approved Ground
2. 1 AWG Ground Wire
3. CBC Ground Terminal Bar at the
MDF (if used)
4. System Single-point Ground
Discharge Bar
5. DC Power Cabinet J58890R or
new DC system
6. Ground Wire for Battery (+)
7. Battery Frame Ground
8. DC Battery Cabinet
9. Main AC Supply (AC Mains)
10. AC to DC power cabinet
11. To Next DC-powered Media Gateway
12. DC load circuit breakers
50A
50A
50A
50A
-48
VDC
-48 V
-48 V
-48 V
-48 V RTN
-48 V RTN
-48 V RTN
MCC
MCC
MCC
10 AWG
RED
10 AWG
6 AWG
AC
phase
AC
phase
10 AWG
10 AWG
10 AWG
10 AWG
BLACK
RTN
cydfdc3i KLC 050304
BLACK
10 AWG
RED
BLACK
10 AWG
RED
10 AWG
RED
10 AWG
BLACK
Batter
y
circuit
breaker
+
-
LVD
Rectifiers
DC power
from rectifiers
+
-
Green/Yellow
Green/Yellow
Green/Yellow
1
2
3
4
5
6
7
8
9
10
11
12
Summary of Contents for 03-300686
Page 1: ...Installing and Connecting the MDF and Telephones 03 300686 Issue 3 Release 5 0 January 2008 ...
Page 8: ...Contents 8 Installing and Connecting the MDF and Telephones ...
Page 28: ...Installing the main distribution frame 28 Installing and Connecting the MDF and Telephones ...
Page 32: ...Installing the patch panel 32 Installing and Connecting the MDF and Telephones ...
Page 40: ...Media gateway connections to the MDF 40 Installing and Connecting the MDF and Telephones ...
Page 53: ...Completing a provisioning plan Issue 3 January 2008 53 Figure 25 Port Assignment Record Form ...
Page 156: ...156 Installing and Connecting the MDF and Telephones Index ...