
74
4.11.3 DC Hipot FAILCHEK
To perform a DC Hipot FAILCHEK, touch the DC Hipot icon and the following screen
will appear:
Follow the instructions on the screen. Press the Test button on the front panel of the
instrument to start the test. If the FAILCHEK test passes, the following screen will
appear:
Summary of Contents for HypotULTRA 7800
Page 34: ...29 ...
Page 53: ...48 ...
Page 121: ...116 ...
Page 128: ...123 ...
Page 143: ...138 ...
Page 187: ...182 ...
Page 202: ...197 Calibration of GFI 5 0mA The calibration of GFI 5 0mA is a two step process ...