AD-P 30/35/4001 SPECIAL BAH0095-2 11.17
7
7.2.1.1
Installation of the analogue working position sensor and the working position
sensor for the seed tube monitoring .................................................................................... 107
7.2.2
Coupling of the tractor and soil tillage implement with the A control
terminal ................................................................................................................................ 111
7.2.2.1
Installation of the digital working position sensor................................................................. 112
7.2.2.2
Installation of the working position sensor for seed drills with seed tube monitoring ......... 113
7.2.3
Coupling the pack top seed drill and the soil tillage implement ........................................... 114
7.2.4
Uncoupling the pack top seed drill from the soil tillage implement ...................................... 118
7.2.5
Checking the tramline track width ........................................................................................ 124
7.2.6
Checking the tramline wheelmark width .............................................................................. 124
8
Settings ..................................................................................................... 125
8.1
Folding the steps up and down ............................................................................................ 126
8.1.1
Folding down the steps ........................................................................................................ 126
8.1.2
Folding up the steps ............................................................................................................. 127
8.2
Fill the seed hopper ............................................................................................................. 128
8.3
Calibrating the seed rate ...................................................................................................... 130
8.3.1
Adjusting the automatic seed rate increase ......................................................................... 131
8.4
Setting the blower fan speed ............................................................................................... 132
8.4.1
Setting the blower fan speed via the flow control valve of the tractor.................................. 133
8.4.2
Setting the blower fan speed on tractors without flow control valve .................................... 133
8.4.3
Switching on the blower fan speed monitoring .................................................................... 133
8.4.4
Pressure relief valve with round outer contour .................................................................... 134
8.4.4.1
Basic setting of the pressure relief valve ............................................................................. 134
8.4.4.2
Blower fan speed setting ...................................................................................................... 134
8.4.5
Pressure relief valve with hexagonal outer contour ............................................................. 135
8.4.5.1
Basic setting of the pressure relief valve ............................................................................. 135
8.4.5.2
Blower fan speed setting ...................................................................................................... 135
8.4.6
Setting the coulter pressure ................................................................................................. 136
8.4.6.1
Mechanical coulter pressure adjustment ............................................................................. 136
8.4.6.2
Hydraulic coulter pressure adjustment ................................................................................ 137
8.4.7
Soil tillage without seeding - Lifting the coulters and harrow ............................................... 138
8.5
Adjusting and checking the seed placement depth ............................................................. 139
8.6
RoTeC Control coulter ......................................................................................................... 140
8.6.1
Adjusting the coulter discs ................................................................................................... 140
8.7
Exact following harrow ......................................................................................................... 142
8.7.1
Exact following harrow tine position ..................................................................................... 142
8.7.2
Setting the exact following harrow pressure ........................................................................ 143
8.7.3
Moving the exact following harrow to the working/transport position .................................. 144
8.7.3.1
Move the exact following harrow into working position ........................................................ 144
8.7.3.2
Moving the exact following harrow into transport position ................................................... 144
8.8
Roller harrow ........................................................................................................................ 145
8.8.1
Setting the pitch of the tines to the ground .......................................................................... 145
8.8.2
Adjusting the working depth of the harrow tines .................................................................. 145
8.8.3
Setting the roller contact pressure ....................................................................................... 146
8.8.4
Lifting/lowering the roller harrow .......................................................................................... 148
8.8.4.1
Lifting the roller harrow (deactivate) .................................................................................... 148
8.8.4.2
Lowering the roller harrow (activate) ................................................................................... 149
8.9
Moving the track marker to the working / transport position ................................................ 150
8.9.1
Moving the track marker into working position ..................................................................... 150
8.9.2
Adjusting the track marker length ........................................................................................ 152
8.9.3
Moving the track marker to transport position ...................................................................... 153
8.10
One-sided switching ............................................................................................................. 154
8.10.1
Mechanically adjustable one-sided switching ...................................................................... 154
8.10.2
Electrically adjustable one-sided switching .......................................................................... 155
8.11
Moving the tramline marker into working/transport position ................................................ 155
8.11.1
Moving the tramline marking device into working position .................................................. 155
8.11.2
Moving the tramline marker into transport position .............................................................. 158
8.12
Moving the transport safety bar into road transport/parking position .................................. 159
8.12.1
Moving the transport safety bar to transport position .......................................................... 159