Cleaning, maintenance and repair
204
AD-P 30/35/4001 SPECIAL BAH0095-2 11.17
12.6
Maintenance schedule – overview
Carry out maintenance work when the first interval is reached.
The time intervals, kilometre readings or maintenance intervals
specified in any third party documentation supplied shall have prior-
ity over the maintenance schedule.
Before initial commissioning
Specialist work-
shop
Check and perform maintenance on the hydraulic hose lines.
This inspection has to be recorded by the operator.
Section 12.6.2
After the first 10 operating hours
Specialist work-
shop
Check and perform maintenance on the hydraulic hose lines.
This inspection has to be recorded by the operator.
Section 12.6.2
Check all the components of the hydraulic system for leaks
Specialist work-
shop
Check all bolted connections for tight fit
Section 12.7
Before each start-up (daily)
Visual inspection of the upper and lower link pins
Section 12.6.3
Check the hydraulic hose lines using the inspection criteria.
Section 12.6.2
Check all the components of the hydraulic system for leaks
Repair any areas of chafing on the hydraulic hose lines and
pipes.
During operation
Overview of checks during operation, see
Section 10.3.1
Hourly (e.g. when refilling the seed hopper)
Check for and remove any dirt:
Distributor
head
Metering
unit
Seed
hoses
Fan suction guard screen
After finishing work (daily)
Empty the seed metering unit
Section 10.4.2
Clean the implement (if required)
Section 12.2
Clean the blower fan (eliminate risk of imbalance).
Every 3 months (at least every 500 operating hours)
Specialist work-
shop
Check and perform maintenance on the hydraulic hose lines.
This inspection has to be recorded by the operator.
Section 12.6.2