Upon delivery, loading and unloading the implement
AD-P 30/35/4001 SPECIAL BAH0095-2 11.17
35
3
Upon delivery, loading and unloading the implement
The pictogram marks the location at which the
slings for lifting the implement with a crane is to
be secured.
Fig. 3
DANGER
Attach the slings for loading the im-
plement with a crane only at the
marked locations.
DANGER
Compliance with this information guarantees your safety:
Load the implement only when the hopper is empty
Please pay attention to the required tensile strength of the sling
Do not walk under suspended loads
Lash the implement down on the transport vehicle in accordance
with regulations.
The pack top seed drill can be loaded as a solo
implement, standing on the parking supports or
in combination with the soil tillage implement and
roller.
Secure the crane hooks to the 3 eyelets (Fig. 4)
in the hopper when loading and unloading
Lash the implement/implement combination onto
the transport vehicle according to the
instructions.
Fig. 4