
Settings
AD-P 30/35/4001 SPECIAL BAH0095-2 11.17
129
1. Couple the implement combination to the tractor (see section "Coupling implements", page 104).
2. Switch off the tractor PTO shaft and wait until it comes to a complete stop.
3. Park the combination on a level surface.
4. Apply the tractor parking brake, switch the tractor engine off and remove the ignition key.
5. Fold down the steps (see section 8.1, page 126).
6. Climb onto the loading board using the steps.
7. Open the roller tarpaulin.
The belt (Fig. 145) serves to open and
close the roller tarpaulin.
The roller tarpaulin opens when the belt is
released.
Fig. 145
8. Adjust the height of the low level sensor
(Fig. 146/1) to the required residual seed
volume.
9. Tighten the wing nuts (Fig. 146/2).
Fig. 146
10. Fill the hopper
with bagged goods from a supply
vehicle
with a filling auger
from Big Bags.
11. Close the roller tarpaulin (Fig. 147/1).
12. Fold up the steps
(see section 8.1, page 126).
13. If known, enter the filling quantity [kg] on the
ISOBUS control terminal
(see "ISOBUS software" operating manual).
Fig. 147