CHAPTER 5: SETUP SOFTWARE
UB25 LINEAR DC RESISTANCE WELDING CONTROL
990-665
5-3
NOTE
: The
SETUP 2
menu is
only
available through the
SETUP 1
or
SETUP
3
menus.
3
To go to the
SETUP 3
menu, press the
▼
(down) key.
NOTE
: The
SETUP 3
menu is
only
available through the
SETUP 2
menu.
4
To scroll back through
SETUP 2
and
SETUP 1
menus, press the
▲
(up) key.
5
When you have finished programming the desired functions, press the
MENU
key on the front
panel to return to the
MAIN MENU
.
SETUP 2
1. DISPLAY CONTRAST
: 080%
2. BUZZER LOUDNESS
: 030%
3. END OF CYCLE BUZZER
: OFF
4. UPDATE GRAPH AFTER WELD
: ON
5. BUZZER ON WELD STOP
: OFF
NUMBER Select, MENU Main menu,
▼▲
Page
SETUP 3 -- PID TEST WELD
1. DO TEST WELD
: ALWAYS
2. IGNORE FIRST/LAST
: 0.2 ms
NUMBER Select, MENU Main menu,
▲
Page 2