![Amada UB25 Operation Manual Download Page 35](http://html1.mh-extra.com/html/amada/ub25/ub25_operation-manual_2915806035.webp)
CHAPTER 2: GETTING STARTED
UB25 LINEAR DC RESISTANCE WELDING CONTROL
990-665
2-5
Voltage Sensing Cable Installation
8
Using a cable tie as a strain relieve, attach each voltage sensing lead to its corresponding electrode
holder so that the lead terminals will not break away under heavy production operating
conditions.
9
Connect the Firing Switch cable connector from the Power Supply to the firing switch cable
connector from the weld head.