![Amada UB25 Operation Manual Download Page 60](http://html1.mh-extra.com/html/amada/ub25/ub25_operation-manual_2915806060.webp)
CHAPTER 4: OPERATING INSTRUCTIONS
UB25 LINEAR DC RESISTANCE WELDING CONTROL
4-12
990-665
Normal STOP
1
When finished welding, follow the
Turn Off/Power Down
procedures established for your
automated welding system.
2
Turn the Power Supply OFF
--
unless
the procedures for your automated welding system require
leaving it ON.
EMERGENCY STOP
NOTE:
Connections for an external Emergency Stop Switch are described in Appendix B.
1
Push the Operator Emergency Stop Switch any time necessary to prevent injury to personnel or
damage to weld pieces or the welding system.
2
Clear the condition that caused the operator to hit the Operator Emergency Stop Switch.
Re-Set After EMERGENCY STOP
1
Clear the condition that caused the
EMERGENCY STOP
condition (whether initiated by an
Operator or by a programmed action from the PLC).
2
Inspect the electrodes, weld head, and weld cables to make sure there are no shorts or damage
that could prevent normal welding.
3
Inspect the production area to verify it is ready to continue welding.
4
Press the
RUN
key on the front of the Power Supply and verify the desired weld schedule is
displayed on the LCD.
5
Continue to weld following normal automation procedures.